My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:56:03 PM
Creation date
11/8/2018 9:59:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
7/23/2018 8:37:33 PM
QuestysRecordID
3946151
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 <br /> 5. SECONDARY PIPE TESTING <br /> lest Method Developed By: ❑ Piping Manufacturer Industry Standard ❑ Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Q Pressure ❑ Vacuum ❑Hydrostatic <br /> ❑Other(Spec) <br /> lest Equipment Used: 4"dial gauge Lquipment Resolut 011: .1 <br /> Unleaded Diesel Waste Oil <br /> Piping Material: fiberglass fiberglass fiberglass <br /> Piping Manufacturer: smith smith ameron <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. Approx. Approx. <br /> Product Stored: Unleaded Diesel Waste Oil <br /> Method and location of Test boot Test boot Test boot <br /> piping-run isolation: <br /> Wait time between applying <br /> pressure/vacuum/water and 15min 15min 15min <br /> starting test: <br /> Test Start Time: 9:05am 9:05am Z00pm <br /> Initial Reading(Ri): 5psi 5psi 5psi <br /> Test End Time: 10:05am 10:05am 3:00pm <br /> Final Reading(RF): 5psi 5psi 5psi <br /> Test Duration: 1 hour 1 hour 1 hour <br /> Change in Reading(RF-R,): 0 0 0 <br /> Pass/Fail Threshold or 0 0 0 <br /> Criteria: <br /> Test Result: ❑X Pass ❑Fail ❑X Pass ❑Fail ❑X Pass ❑Fail ❑ Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follotiv-up for failed tests) <br /> sensor was removed from testing and was put back after finish <br />
The URL can be used to link to this page
Your browser does not support the video tag.