My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2017
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
4040
>
2300 - Underground Storage Tank Program
>
PR0231963
>
COMPLIANCE INFO_2016 - 2017
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2019 2:56:03 PM
Creation date
11/8/2018 9:59:50 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2017
RECORD_ID
PR0231963
PE
2361
FACILITY_ID
FA0006445
FACILITY_NAME
PG&E: Stockton Service Center
STREET_NUMBER
4040
STREET_NAME
WEST
STREET_TYPE
Ln
City
Stockton
Zip
95204
APN
117-020-01
CURRENT_STATUS
01
SITE_LOCATION
4040 West Ln
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS3\W\WEST\4040\PR0231963\COMPLIANCE INFO 2016 - 2017.PDF
QuestysFileName
COMPLIANCE INFO 2016 - 2017
QuestysRecordDate
7/23/2018 8:37:33 PM
QuestysRecordID
3946151
QuestysRecordType
12
QuestysStateID
1
标签
EHD - Public
该页面上没有批注。
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RECEIVED <br /> UST SYSTEM RETROFIT OR REPAIR DEC 2 2 2016 <br /> (Submit minimum of 3 sets of plans&applications as originals will be retained by EHD) <br /> 1. Site map enclosed? YES j( NO [] ENVIRONMENTAL <br /> ii HEALTH <br /> 2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training cPe i icateEforr each <br /> person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br /> Plan" is available on the jobsite as required by Title 8. <br /> 3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br /> to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br /> adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br /> pages 4-8 as necessary for a timely plan review): <br /> Remove and Replace (E) wall mounted Waste Oil Drain Table and Drip Tray in <br /> Maintenance Garage. (N) Drip Tray to extend Beneathe (E) Filter Crusher. <br /> Install (N) Drain Piping and Fittings. Install (N) Electric Ball Valve on <br /> Drain Piping That closes-with the V/R High Level Sensor set @ 90% High level <br /> in the 1,000 gallon UST. <br /> 4. List of equipment to be used (Attach manufacturer's specification sheets showing third-party approval): <br /> ValWorx Electric Actuated Stainless Steel Ball Valve 2", 120VAC Qty. 1 <br /> Veeder Root 794380-208 Sensor Qty.1 <br /> Veeder Root 794390-420 Sensor Qt. 1 <br /> EH230038(revised 7-26-2016) 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.