Laserfiche WebLink
Site Address: SS#9600, 1250 N WILSON WAY,STOCKTON Date of Testing/Servicing: 10—N -Ls- <br /> Monitoring System Certification <br /> UST Monitoring Site Plan <br /> T M� . . . . . . . . . . . . . . . . . . CQ�. .... . . . . . �j iy . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . : � fst. . . . . . . . . . <br /> s . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . : t . . . . s#,r . . . . . . . <br /> . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . <br /> Date map was drawn: 10/ Ly / dl-. <br /> Instructions <br /> If you already have a diagram that shows all required information, you may include it, rather than this page, with your <br /> Monitoring System Certification. On your site plan, show the general layout of tanks and piping. Clearly identify <br /> locations of the following equipment, if installed: monitoring system control panels; sensors monitoring tank annular <br /> spaces, sumps, dispenser pans, spill containers, or other secondary containment areas; mechanical or electronic line leak <br /> detectors; and in-tank liquid level probes (if used for leak detection). In the space provided,)note the date this Site Plan <br /> was prepared. <br /> Page of_ 05/00 <br />