My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2300 - Underground Storage Tank Program
>
PR0231299
>
COMPLIANCE INFO 2001-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 10:58:05 AM
Creation date
11/8/2018 10:00:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2004
RECORD_ID
PR0231299
PE
2361
FACILITY_ID
FA0003972
FACILITY_NAME
THRIFTY OIL COMPANY
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1250\PR0231299\COMPLIANCE INFO 2001-2004.PDF
QuestysFileName
COMPLIANCE INFO 2001-2004
QuestysRecordDate
5/24/2018 4:08:19 PM
QuestysRecordID
3903911
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641(h) <br /> FACILITY NAME N u7 `1 o o DATE -1 / 1 1 e-1- <br /> FACILITY ADDRESS cn w w 5 o nJ w rav r S Toc K To�1 <br /> 1.Name(s)and Title(s)of the people responsible for performing the monitoring and/or maintenance <br /> (7o W-1 S O STEK�✓.wl D k r 0- 04( C--f - L f c-71-#;VVZ M i 1Y ar t T o\K l N 6 <br /> A-It-C,Q r-1 I S 5 1 O N (gyp N'r9-C1L Clr^14-!N TEp/A- C'E D t S(N''rG fit ) <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS- rn l.s T 1 N V oma.S PIPING ezi,r1 N✓uuS <br /> 3.Describe the location(s)of where the monitoring will be performed. ie:location ofsensors <br /> SG-NSaK-S two .ft'Ten N q-NNvLAY-- SfACe fSurAers sl 1 ML . VWVCCA- fA-&JEll tN oFF+c.S <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel V eeQaYoT n S 350 <br /> Name and Model of Line Leak Detectors V Pee cw-L4S S 1� t-D -'Loo u <br /> Name and Model of Annular Sensors v e-e-vCo- 9-00'V '1 9 u 3 S o - L4 o'R <br /> Name and Model of Piping Sensors V EEVCn- dLooT 2-01 <br /> Name and Model of Dispenser Sensors V ev�o n- 0-n0T `19 N 3`'o 2--o8 <br /> Type of overfill prevention ^r'n`� v msµ` 1 DYw P T✓'rr? <br /> 5.Do the Turbine Sensors and Dispenser Pan Sensors shut down the turbine? Yesx No D <br /> Does the turbine shut down if a sensor is disconnected? Yes 19 No D <br /> Does the turbine shut down is the monitoring panel loses power? Yes 18' No D <br /> 6.How will the alarm history and subsequent maintenance be recorded? <br /> Aj M,c-M w% -I;t✓ LO b(il`-D ori UST fit'"" LO(a� Rw0 p_,E@v12E0 YK P'IN'rrTr�r'� <br /> p TFY� "V ft-fr OS uLN 0.E V -e P-r " r2..W.NlsG ( Yt..I In.NG.,1% ISINAe^M1 <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for the monitoring equipment.What month wnll <br /> annual monitoring certification be performed in? . •NS tr pool 5gv a o c EM S w 1e rf a60`21TwL <br /> It+11i1,. Rrt5 lsl ve_.Ep I1•4'10 Mtiil'DN (b(.tt K.Ol • t1.19NyroyL is rta.rtrf Edi 6N <br /> Note:For new installations the secondary containment must be tested 6 months after installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December3l,2003. <br /> 8.Describe the training necessary for the operation of UST system, including piping,and the monitoring <br /> equipment. 'Tea1NG w\1--L RE P"Y1DC� V?0" fN�6 a-Nn at-f 2..e=sKM- t12�'1 N.N4 <br /> YLOv1D�0 FT \.0-FST A-N NVWu,� ,n..ye.y(-E.y4.f-r{-uC, <br /> 1.\mstemi•le\USi\monitoringplan.doc <br /> 124/2002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.