Laserfiche WebLink
r REC OVED <br /> MONITORING SYSTEM CERTIFICATION tap 3 12002 <br /> For Use By All Jurisdictions Within the State of California f ' et�t'ps®��At7tE�,�H <br /> Authority Cited: Chapter 6.7, Health and Safety Code; Chapter 16,Division 3, Title 23, Cali or ' �T SERV" <br /> rPdr fbbo <br /> ICES <br /> This form must housed to document toting and servicing of monitoring equipment.a separate certificatio must be prepared <br /> for each monitoring system control panel by the technician who performs the work. A copy of this form must be provided to the tank <br /> system owner/operator. The owner/operator must submit a copy of this form to the local agency regulating UST systems within 30 <br /> days of test date. <br /> A. General InformatioQ� f/ <br /> Facility Name: ���-� t r'`-^-' B ld'g.No.: <br /> Site Address: Irrj� City: 56ro ' l Zip: <br /> Facility Contact Person: MQ�l k n Contact Phone No.: ( �y �'�•�r <br /> Make/Model of Monitoring System: �� Rom T(S ASO Date of Testing/Servicing: 4 /tea c ire <br /> B. Inventory of Equipment Tested/Certified <br /> Check the appropriate boxes to indicatespecific equipment ins ected/serAced: 1 <br /> Tank ID: Tank ID: V <br /> 0 In-Tank Gaugin robe. Model: 0 In-Tank Gauging Probe. Model: <br /> Nr Annular Space or Vault Sensor. Model:��{'sq0-42U Annular Space or Vault Sensor. Model:" <br /> CM15W 4ZU <br /> §e Piping Sump/Trench Sensor(s). Modell g436D'-X8 8 Piping Sump/Trench Sensor(s). Model. <br /> AT Fill Sump Sensor(s). Mode1:1Q4'S5'sD•'-NI>3 9Fill Sump Scnsor(s). Model:')Cey's <br /> _ _. ' Z0016 <br /> Mechanical Line Leak Detector. Model: qQt-13,61cm J&Mechanical Line Leak Detector. Model: gCD�rs� <br /> 0 Electronic Line Leak Detector. Model: 0 Electronic Line Leak Detector. Model: <br /> 0 Tank Overfill/High-Level Sensor. Model: 0 Tank Overfill/High-Level Sensor. Model: <br /> 0 Other(specify equipment t e and model in Section E on Page 2). 0 Other(specia equipment tv a and model in Section E on Page 2). <br /> Tank ID: Tank ID: <br /> 0 In-Tank Gaug g Probe. Model: 0 In-Tank Gauging Probe. Model: <br /> r,K Annular Space or Vault Scnsor. Modell44� 0 Annular Space or Vault Sensor. Model: <br /> R Piping Sump/Trench Sensor(s). Modc1:1445 2) Cl Piping Sump/Trench Sensor(s). Model: <br /> JET Fill Sump Sensor(s). Modell 43�' 0 Fill Sump Sensor(s). Model: <br /> ,»Mechanical Line Leak Detector. Model: I C.lY Y? CI Mechanical Line I-eak Detector. Model: <br /> 0 Electronic Line Leak Detector. Model: 0 Electronic Line Leak Detector. Model: <br /> 0 Tank Overfill/High-Level Sensor. Model: 0 Tank Overfill/High-Level Sensor. Model: <br /> 0 Other(specify equipment ty a and model in Section E on Page 2). 0 Other(s ecify equipment ty a and model in Section E on Page 2). <br /> 40 <br /> Dispenser ID: —Z Dispenser ID: �Ll <br /> XDispenserContainmentSensor(s). Model: 3'50"3 l J� Dispenser Containment Sen'sor(s). Model: <br /> 0 Shear Valve(s). 0 Shear Valve(s). <br /> 0 Dispenser Containment Flont(s)and Chain(s). 0 Dis enser Containment Float(s)and Chain(s). <br /> etspewer ID: y'10 Dispenser ID: <br /> ❑ Dispenser Containment Sensor(s). Model: � t Jf Dispenser Containment Sensor(s). Model054 O'3Z.t <br /> 0 Shear Valve(s). 0 Shear Valve(s). <br /> 0 Dispenser Containment Float(s)and Chain(s). 0 Di enser Containment Float(s)and Chain(s). <br /> Dispenser ID: 4`l Dispenser ID: l t`U— <br /> R Dispenser Containment Sensor(s). Model: t7D'S2l B.e Dispenser Containment Sensor(s). Model: &OW_n k <br /> 0 Shear Valve(s). 0 Shear Valve(s). <br /> Obis enser Containment Float(s)and Chain(s). 0 Dispenser Containment Float(s)and Chain(s). <br /> -If the facility contains more tanks or dispensers,copy this form. Include information for every tank and dispenser at the facility. <br /> C. Certification -I certify that the equipment identified in this document was inspected/serviced in accordance with the manufacturers' <br /> guidelines. Attached to this Certification is information (e.g. manufacturers' checklists) necessary to verify that this information is <br /> correct and a Plot Plan showing the layout of monitoring equipment For any equipment capable of generating such re ,I ve also <br /> attached a copy of the report;(check all that apply): 1�System set-up Alarm history repo <br /> Technician Name(print): rihni Fn f- Signature: <br /> Certification No.: .JL�—�01 �y License.No.: <br /> Testing Company Name:� Scott Co of California Phone No.:( gin ) RqS-7"I-R ,r -IRS <br /> Site Address: ���7 y�I,1 (lf5�V • Date of Testing/Servicing: 4 � � <br /> Page 1 of 3 03/01 <br /> Monitoring System Certification <br />