Laserfiche WebLink
r � <br /> D. Results of Testing/Servicing <br /> Software Version Installed: <br /> Com lete the following checklist: <br /> Yes ❑ No* Is the audible alarm One <br /> Yes Cl No* 1s the visual alarm o erational? <br /> Yes ❑ No* Were all sensors visuall ins erred,functionall tested,and confirmed operational? <br /> Yes ❑ No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment will <br /> not interfere with their proper o eration? <br /> ❑ Yes ❑ No* If alarms are -relayed to a remote monitoring station, is all communications equipment (e.g. modem) <br /> JW N/A operational? <br /> Yes ❑ No* For pressurized piping systems, does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate,or is electrically disconnected? If yes: which sensors initiate <br /> positive shut-down? (Check all that apply)$Sump/Treneh Sensors;0 Dispenser Containment Sensors. <br /> Did You confirm positive shut-down due to leaks and sensor failure/disconnection?X Yes; ❑No. <br /> ❑ Yes ❑ No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e. no <br /> A N/A mechanical overfill prevention valve is installed), is the overfill warning alarm visible and audible at the tank <br /> fillpoint(s)and operating ro erl ? If so,at what percent of tank capacity does the alarm trigger? % <br /> Yes* ❑ No Was any monitoring equipment replaced? If yes,identify specific sensors, probes,or other equipment replaced <br /> and list the manufacturer name and model for all re lacement parts in Section E, below. <br /> ❑ Yes* No Was liquid found inside any secondary containment systems designed as dry systems? (Check all that apply)❑ <br /> Product; ❑Water. If yes, describe causes in Section E,below. <br /> Yes 1 ❑ No* Was monitorings stem set-u2 reviewed to ensure pro2er settings?Attach set up reports,if applicable <br /> Jff—Ys ❑ No* Is all monitoring a ui ment o erational er manufacturer's s ecifications? <br /> *In Section E below,describe how and when these deficiencies were or will be corrected. - <br /> E. Comments: `(ICP aq 1c,ebine men Yz -CCn �LflSd2 n4--�im-hontrig <br /> Page 2 of 3 03/01 <br />