Laserfiche WebLink
0 0 <br /> 3. Piping Leak Detection Monitorin E ui ment <br /> Monitoring Method Manufacturer Model Monitoring Frequency <br /> ® Sump leak sensors connected to Veeder Root 74380-208 <br /> continuous monitoring system <br /> Specify type: Continuous <br /> ❑ Discriminating <br /> ® Non-discriminating <br /> ® Mechanical line leak detectors with Vaporless LD2000 <br /> programmed leak threshold of three Every pumping cycle <br /> gallons per hour <br /> ❑ Electronic line leak detectors with <br /> programmed leak threshold of <br /> ❑ 0.1 h ❑0.2 h ❑3 h Every pumping cycle <br /> ® Line integrity testing by: <br /> ❑ Electronic line leak detector is <br /> equipped to conduct line tightness ❑Annually <br /> testing <br /> ❑Third party testing Other: <br /> Third <br /> ® Not required <br /> ❑ Other(Specify): <br /> 4. Dispenser Leak Detection Monitorin E ui ment <br /> Mon'to rin Method Manufacturer Model MonitoringFrequency <br /> ❑ Mechanical float in dispenser <br /> containment Continuous <br /> ® Electronic leak sensor in dispenser Veeder Root 74380-208 <br /> containment: <br /> ❑ Discriminating Continuous <br /> ® Non-discriminatin <br /> ❑Visual inspection Visual inspection log maintained on site. ❑ Daily <br /> ❑ Other: <br /> ❑ No under-dispenser containment <br /> ❑ Other(specify): Mechanical Float activates shear valve when leak detected. <br /> 5. Positive Shutdown Capabilities <br /> ❑ S stem does not have positive shutdown capabilities <br /> ❑ Individual dis enser shutdown will occur whenever release is sensed in under-dispenser containment <br /> I❑Automatic pump shut off will occur whenever: <br /> ❑ Release is sensed in turbine sump <br /> ❑ Release is sensed in primary piping <br /> ® Release is sensed at dispenser <br /> ® Monitoring system is disconnected or fails in any way(fail safe) <br /> ❑ Other(specify): <br /> 6. Secondary Containment Testing <br /> ❑ Seconda containment is not tested <br /> ® In the State of California,secondary containment systems installed on or after January 1,2001,shall be tested upon installation, <br /> six months after installation,and every 36 months thereafter. Secondary containment systems installed prior to January 1,2001, <br /> shall be tested by January 1,2003, and every 36 months thereafter. <br /> 7. Annual Equipment Certification[Testin <br /> ®Annual! <br /> ❑ Other(specify): <br /> 2 <br />