My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2001-2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2300 - Underground Storage Tank Program
>
PR0231299
>
COMPLIANCE INFO 2001-2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 10:58:05 AM
Creation date
11/8/2018 10:00:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2004
RECORD_ID
PR0231299
PE
2361
FACILITY_ID
FA0003972
FACILITY_NAME
THRIFTY OIL COMPANY
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1250\PR0231299\COMPLIANCE INFO 2001-2004.PDF
QuestysFileName
COMPLIANCE INFO 2001-2004
QuestysRecordDate
5/24/2018 4:08:19 PM
QuestysRecordID
3903911
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
238
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2003 • • <br /> Page_of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Spec6) <br /> i <br /> Equipment Used: / S� L EquipmentResolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: rj tjz /✓ /S tiL /3 y 7 �lz <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 2-3 b 7, :k. 7 f :3 0 2 3D 2 ?v ? 30 <br /> Initial Reading(Rj): 61" G D / ), <br /> Test End Time: 3: p • .30 3 3v 3v 3 37i <br /> Final Reading(RF): G 2, ', , 3 n% <br /> Test Duration: 2 At :2 RA <br /> Change in Reading(RF-Rj): . ,t g 3/y L <br /> Pass/Fail Threshold or /I <br /> Criteria: EA-IL IL r.A/c_ <br /> Test Result: Ids aw` PassFail <br /> 'P-7FIi >^ If 1�I <br /> Ve f'c�2 4 I L` o/tI?resrs� <br /> Comments—(include information on repairs ma e p 'or to tesnng, an recom e o ow-up or a, <br />
The URL can be used to link to this page
Your browser does not support the video tag.