Laserfiche WebLink
SWRCB,January 2003 • • <br /> Page_of <br /> 9. SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes <br /> Spill/Overfill Containment Boxes are Present, but were Not Tested <br /> Test Method Developed By: Spill Bucket Manufacturer Industry Standard Professional Engineer <br /> Other(Specify) <br /> Test Method Used: Pressure Vacuum Hydrostatic <br /> Other(Spec6) <br /> i <br /> Equipment Used: / S� L EquipmentResolution: <br /> Spill Box# Spill Box# Spill Box# Spill Box# <br /> Bucket Diameter: <br /> Bucket Depth: rj tjz /✓ /S tiL /3 y 7 �lz <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: 2-3 b 7, :k. 7 f :3 0 2 3D 2 ?v ? 30 <br /> Initial Reading(Rj): 61" G D / ), <br /> Test End Time: 3: p • .30 3 3v 3v 3 37i <br /> Final Reading(RF): G 2, ', , 3 n% <br /> Test Duration: 2 At :2 RA <br /> Change in Reading(RF-Rj): . ,t g 3/y L <br /> Pass/Fail Threshold or /I <br /> Criteria: EA-IL IL r.A/c_ <br /> Test Result: Ids aw` PassFail <br /> 'P-7FIi >^ If 1�I <br /> Ve f'c�2 4 I L` o/tI?resrs� <br /> Comments—(include information on repairs ma e p 'or to tesnng, an recom e o ow-up or a, <br />