My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2300 - Underground Storage Tank Program
>
PR0231299
>
COMPLIANCE INFO 2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231299
PE
2361
FACILITY_ID
FA0003972
FACILITY_NAME
THRIFTY OIL COMPANY
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1250\PR0231299\COMPLIANCE INFO 2005-2008.PDF
QuestysFileName
COMPLIANCE INFO 2005-2008
QuestysRecordDate
5/24/2018 4:59:31 PM
QuestysRecordID
3904191
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UNDERGROATOR4GE TAINK MONITORING SY STEOERTIFICATION' <br /> F. In-Tank Gauging/ SIR Equipment: Permit Number: <br /> ❑ Check this box if tanh gauging is used only for invemor7 control <br /> ❑ Check this box if no tank gauging or SIR equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring <br /> Complete the followinZ checklist: +nti/ -« <br /> ❑ Yes ❑ No* Has al] input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> ❑ Yes ❑ No* W ere all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes ❑ No* Was accuracy of system product level readings tested? <br /> ❑ Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑ Yes ❑ No* Were all probes reinstalled properly? <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In Section H below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): ❑ Check this box i°LLDs are not installed <br /> Complete the foho ing checklist: <br /> ❑ Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check alt that apply) Simulated leak rate: ❑3 g.p.h.; ❑0.1 g.p.h. ; ❑ 0.2 g.p h. <br /> ❑ Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A- <br /> Z) Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ❑ Yes O No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> ❑ NIA or disconnected? <br /> ❑ 'Yes ❑ No* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> ❑ NIA or fails a test? <br /> ❑ Yes ❑ No* For electronic LLD;have all accessible wiring connections been visually.inspected? <br /> ❑ N/A <br /> ❑ Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> "In Section H below,-describe-how and when these deficiencies were or will be corrected. <br /> H. Comments: <br /> 'i <br /> Page 3 of 4 County of San Diego DEH-Haaardous Materials Division. <br />
The URL can be used to link to this page
Your browser does not support the video tag.