My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2005-2008
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WILSON
>
1250
>
2300 - Underground Storage Tank Program
>
PR0231299
>
COMPLIANCE INFO 2005-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:00:35 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2008
RECORD_ID
PR0231299
PE
2361
FACILITY_ID
FA0003972
FACILITY_NAME
THRIFTY OIL COMPANY
STREET_NUMBER
1250
Direction
N
STREET_NAME
WILSON
STREET_TYPE
WAY
City
STOCKTON
Zip
95205
APN
11731001
CURRENT_STATUS
02
SITE_LOCATION
1250 N WILSON WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\W\WILSON\1250\PR0231299\COMPLIANCE INFO 2005-2008.PDF
QuestysFileName
COMPLIANCE INFO 2005-2008
QuestysRecordDate
5/24/2018 4:59:31 PM
QuestysRecordID
3904191
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board&Software Replacement Before Turning ON Power-All Procedures <br /> Remove the grounding wrist strap from <br /> its package and wrap one end around <br /> ® your wrist. Ahere the other end to the <br /> 2side of the comm board cage. <br /> Pivot edge of tool <br /> against inner partition <br /> of console. <br /> �rew�cpueaoN..a. CPU Board <br /> Place curved end of the removal <br /> tool under front end of CPU board at <br /> each retention pin location(3 places) <br /> and rotate tool to pry the board <br /> off of the retention pin. Replace <br /> 0 o removal tool in its storage position. <br /> CPU Board Installation guide a a 10 <br /> slots(one at top and bottom) o 0 <br /> I « o <br /> 3 Ret ieve Board Removal I <br /> tool from its storage Pull the board straight out until you disconnect <br /> position on the top of the it tram the motherboard connector and it <br /> comm cage by pulling on !71 clears the top and bottom guldes. Rotate It <br /> black knob in center of �-lJ towards you to clear the door. Hold the CPU <br /> tool. hoard by its edges and avoid touching <br /> components and connector pins. <br /> 5 m <br /> Disconnect each of the two cables a o <br /> attached to the CPU board,and the <br /> printer cable from the Local Printer ° + <br /> Cam Board. <br /> Remove ac power to the <br /> console. Push down to <br /> _ turn battery backup OFF. ° <br /> BATr OPEN <br /> Figure 2. Removing CPU Board <br /> 5. Place old and new CPU boards side by side on a clean work surface.Make sure the Battery Backup switches P on <br /> both boards are in the Off position.Remove the SEM(see Figure 17 on page 29) and the PROM chi see e <br /> 17)from the old CPU board and plug them into the identical sockets on the new CPU board. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.