Laserfiche WebLink
F. In-Tank Gauging/SIR Equipment: ® Check this box if tank gauging is used only for inventory control. <br /> Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the following checklist: <br /> WNo* Was <br /> Has all input wiring been inspected for proper entry and termination,including testing fo=fau <br /> Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Was accuracy of system product level readings tested? <br /> Was accuracy of system water level readings tested? <br /> Were all probes reinstalled properly? <br /> Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): O Check this box if LLDs are not installed. <br /> F <br /> e the following checklist: <br /> ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: ZI g.p.h.; ❑ 0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ No* Were all LLDs confi med operational and accurate within regulatory requirements? <br /> ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> �N/A or disconnected? <br /> ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> UN/A or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> UN/A <br /> Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. / <br /> H. Comments: 1C6f 4 ED " S e d l 1CUT &4 `1631 873 +1v <br /> Page 3 of 3 03101 <br />