Laserfiche WebLink
WRITTEN MONITORING AND RESPONSE PLAN <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times.The information on this monitoring program are <br /> conditions of the operating permit.The permit holder must notify Environmental Health Department,(209)468-3420 <br /> within 30 days of any changes to the monitoring procedures,unless required to obtain approval or a permit before making <br /> the change.Required by CCR 2632(d)and 2641 (h) <br /> FACILITY NAME M V P81ut M DATE '743 -0-3 <br /> FACILITYADDRESS V7 kJle <br /> l.Name(s)and Title(s) of to people responsible for performing the monitoring and/or maintenance <br /> o v+ <br /> 2.Describe the frequency of performing the monitoring for: <br /> TANKS�Rt�OUG-�' PIPINGGo�1� t �xs <br /> 3.Describe the location(s) of where the monitoring will be performed. ie: location ofseirsors <br /> 4.Describe the following equipment for each underground storage tank. <br /> Name and Model of Monitoring Panel k,r' C>tS 'Tr \C> ` <br /> Name and Model of Line Leak Detectors JFX <br /> Name and Model of Annular Sensors --Z r^ ny E_- S <br /> Name and Model of Piping Sensors <br /> LNameModel of Dispens orrfill preventi <br /> 5.Do the Turbine Sensors but down the turbine? Yes / o <br /> Does the turbine shut down if a sensor is disconnected? Yes8 No❑ <br /> Does the turbine shut down is the monitoring panel loses power? Yes L�No 0 <br /> 6. How will to alarm history and subsequent maintenance be recorded? <br /> 7.Maintenance of the monitoring equipment must be performed at least once every 12 months. <br /> Describe the preventive maintenance schedule and recording for�monit�' equipment.What lmont will <br /> annual monitoring certification be performed in?\ &, <br /> o cola i ✓ Z <br /> Note:For new installations the secondary containment must be tested 6 months efer installation.All secondary containment systems <br /> must be tested once every 36 months with initial testing performed before December3l,2003. <br /> 8.Describe the training necessary for the operation of UST system, including piping, and the monitoring <br /> equipment� k- <br /> 1n , o >��� two 1E0 !s� T 71�M�rAT AND�PI�tIJ Eft <br /> 1:4nstem i.le\USPmon itoringplan.dm <br /> 1/24/2002 <br />