Laserfiche WebLink
TiEcEIVEL) <br /> SWRCB,January 2002 Page of <br /> 5. SECONDARY PIPE TESTING JUN 2 9 2015 <br /> Test Method Developed By: X Piping Manufacturer i Industry Standard <br /> l�j#(% VCTV� tT1L <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑ ydrostatic <br /> Other(Spec) <br /> Test Fquipmcnt Used: Pressure GaugeS in Psi!Nitro,'cn F,quipment Resolution: I/10-IS Psi <br /> Piping Run#1 Piping Run#2 Piping Run# Piping Run# <br /> Piping Material: Fiberglass Fiberglass <br /> Piping Manufacturer: Ameron Ameron <br /> Piping Diameter: 3" 3" <br /> Length of Piping Run: 40' 50' <br /> Product Stored: Regular 87 Super 91 <br /> Method and location of Test boot at STP Test boot at STP <br /> piping-run isolation: Piping Sump#1 Piping Sump#2 <br /> Wait time between applying 10 Minutes 10 Minutes <br /> pressure and starting test: <br /> Test Start Time: 9:35 9:45 <br /> Initial Reading(Ri): 3.2 Psi 3.2 Psi <br /> Test End Time: 10:35 10:45 <br /> Final Reading(RF): 3.2 Psi 3.2 Psi <br /> Test Duration: 1 Hour 1 Hour <br /> Change in Reading(RF-Rj): 0 Psi 0 Psi <br /> Pass/Fail Threshold or No Loss in Psi No Loss in Psi <br /> Criteria: <br /> Test Result: Pass Pass <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />