My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:49:21 AM
Creation date
11/8/2018 10:02:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1434\PR0231465\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
6/26/2017 11:25:13 PM
QuestysRecordID
3467494
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging/SIR Equipment: a Check this box if mak ganging is used only for inventory control. <br /> Q Check this box if no tank gauging or ST equipment is installed. <br /> This section must be completed if in-tank gauging equipment is tised to perform leak detection monitoring. <br /> C e the fall* - rhewist <br /> Q Yes �--1 Nos Has an input wiring been inspected for proper entry andterminaaoa including testing for ground faults? <br /> D Yes t7 No* Were alt took ganging probes visually inspected for damage and rendre bnHdwp? <br /> Q Yes E3 No's Was ttaaaacy of system product level readings tested'. <br /> Q Yes Q No* Was accuracy of sysmrn wMef level readings wsoed? <br /> Ll Yes U No" Were a0 probes reinata➢ed properly? <br /> Q Yes Q No` Wem all item on the egoirnxntmanufacmra's ngumenmce> completed? <br /> :In the Section$below,describe Gov and when these dims werx or win be tna-rtxFed. <br /> G. Line Leak DeteCtOiS(LLD): ❑ Check this box if LLDs are not installed. <br /> C letethefonowin cheeldio- <br /> f,Ti�Yes � Ain" For equipment start-up or annual equipment oertificativa, was a leak s-vaulated to verify 11.D pvfomoance- <br /> NIA (Check all dw,apply) Si nu aced leak ran_ Q 3 g.ph: Q 01 g-p-b. Q 0.2 g pil <br /> i <br /> 14 Yes ❑ No' Wine an LLUs confirmed operanonal and a=more within regulatory wquuementa- <br /> .@ Yes i7 No= Was the testwg apparams properly calibrated? <br /> Yes ❑ No' For mechawcai U Ds,does the ILD restna producttlow if it demos a leak? <br /> Q NIA <br /> Q Yes C3 No- fnretectrooic I I Ds,does the turbine automaucalty shat off if the ILD detects a leak? <br /> ❑ N/A <br /> Q Yes Q No' I For electronic LLDs.does the tatbioe autamabcOy SW off If an9 potmom of the maait*rmg system is disabled <br /> Ea lira m disco»s=ted° <br /> Q Yes Q Nov For aloctm a ILDs,does the tmbine automatically shut off if my portion of the m0niwrriag system malfunctions <br /> Q NIA or fails a trsr? <br /> Yes ❑ No- FW e]ectronic LCDs,have an ttccesnlrle wiring eo®ecGtms been vwually inspected? <br /> Q NIA <br /> Yes ❑ No* I Were all items on the equipmemmantdactur&S maimeaance checklist completed? <br /> c In the Section H,below,d®rdbe baw and when Smese def were*r will be corrected.. <br /> H. Comments: <br /> Page 3 of 3 OYDI <br />
The URL can be used to link to this page
Your browser does not support the video tag.