My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:49:21 AM
Creation date
11/8/2018 10:02:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1434\PR0231465\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
6/26/2017 11:25:13 PM
QuestysRecordID
3467494
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MECHANICAL LINE LEAK BEIECTOR <br /> • ■he FE Petro STP-MLD increases until at 3 GPH the will close when several nozzles <br /> Mechanical Line Leak Detector leak detector will never open. are open at the same time. <br /> combines streamline design, It will detect leaks even when Unique internal design <br /> quality materials,solid there is as much as 10 feet maintains leak sensitivity <br /> construction, and unique difference in elevation between and minimizes opening time <br /> k' features to offer you unmatched the point of the leak and the variation with vapor in the <br /> performance and maintenance leak detector. pipelines and changes in the <br /> free reliability. fuel temperature. The piston <br /> The STP-MLD is engineered Built In Quality style design provides a reser- <br /> and built to maintain its The use of a brass piston voir of fluid to compensate <br /> performance accuracy for years provides a rugged,non-corrosive, for thermal contraction of the <br /> of operation. It will reliably strong material which will not product,reducing the likeli- <br /> maintain its ability to detect deflect under pressure.This hood of leak detector trips <br /> true leaks without any false drastically reduces the when the temperature of the <br /> indication of leaks. potential for leakage product is higher than the <br /> past the piston temperature of the piping <br /> Reliable seal or and surrounding area. <br /> The STP-MLD is a proven <br /> performer with extensive Easy Installation <br /> laboratory and field testing. Streamline design allows <br /> It complies with U.S. EPA easy access with socket or <br /> requirements 280.41(B)and pipe wrench and high <br /> 280.44(A) for automatic leak strength socket head <br /> detection in pressurized pump- t= cap screw material <br /> ® ing systems. It is third party ti� will withstand any <br /> certified for performance as a torque required for <br /> required by the EPA.* assembly or removal. <br /> .-The MLD is UL listed for A vertical vent tube <br /> all blends of flammable motor exit enables easier <br /> fuels including gasoline, and more direct <br /> kerosene, diesel fuels and tube connection.The <br /> gasoline—alcohol blends with separations MLD is UL listed <br /> alcohol concentrations from of the piston for installation <br /> 0 to 100%ethanol or methanol, from the shaft. directly into all <br /> 15%MTBE with 85%gasoline All dynamic FE Petro STP Model <br /> or 17%TAME and 83%gasoline. sealing surfaces submersible pumps; <br /> This unit will continuously are made of Red Jacket Model <br /> monitor pressurized pumping Teflon on brass `P33R1,P75S1,P150S1, <br /> and will indicate any size leak. or stainless to minimize ` AGP33R1,AGP75S1,and <br /> Leaks greater than 3 gallons corrosion and wear,and are AGP150S1 pumps,or Tokheim <br /> per hour(GPH)are indicated resistant to damage from Model 585A-34 and 585A-150 <br /> by greatly reduced output from abrasives in the fuel.There is pumps.Auxiliary housing is <br /> the pump of approximately 2 no plating or coating that will not necessary when installing <br /> gallons per minute(GPM). peel or wear through. the MLD into any of these <br /> Leaks less than 3 GPH are model pumps. <br /> Unique Features <br /> indicated by the leak detector 9 When installed in a Red <br /> taking longer than the normal The MLD stays open when Jacket pump,it is not necessary <br /> 3 seconds to open** The smaller pumping for maximum product to remove the leak detector <br /> ® the leak the nearer to 3 seconds delivery to line pressure as low when replacing the capacitor, <br /> opening time, as the leak gets as 1 psi.There is never the providing a safer work <br /> nearer to 3 GPH,the time concern that the leak detector environment. <br /> When flexible piping is installed, use STP-MLD E <br /> x*Avoid longer opening times when pomphi-diesel or kerosene b� using <br /> �1P-MhD-D. <br />
The URL can be used to link to this page
Your browser does not support the video tag.