Laserfiche WebLink
F <br /> UST PROGRAM INSPECTION REPORT <br /> Facility Name FDS Address:��3Lr W. <br /> 25—CCR 2643 (d) Triennial tightness test of suction piping that is not continuously <br /> monitored <br /> 26—CCR 2643 (e) Biennial tightness test of gravity piping that is not continuously <br /> monitored <br /> 27 CCR 2662 Upgrade requirements for UST system <br /> 28 CCR 2661 Permit to repair UST system <br /> 29 HSC 25286(a) Permit to alter monitoring system <br /> 30 HSC 25298 (a) Illegal abandonment of UST system <br /> 31 HSC 25298 (b) Permit to temporarily close UST system <br /> 32_HSC 25298 (c) Permit to close UST system <br /> 33_ Violation(s)not listed above <br /> Observation(s): <br /> w 2�-- <br /> T 191 Cb <br /> {A C'�11 t�L <br /> Inspectio :.Type Date <br /> REHS _Print l OYI b of <br /> Received by t Print C�r/�e C� <br /> Title bass aot Phone - 16- 92 6 <br /> 5�DYiq)k tom: 2JDq -23q- [I G2 <br /> PHS 260(8/04/00) . 2 of 2 <br />