Laserfiche WebLink
Page 4 of 8 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 0 Piping Manufacturer O Industry Standard ❑ Professional Engineer <br /> 0 Other(Specify) <br /> Test Method Uses: 0 Pressure <br /> ❑Vacuum ❑Hydrostatic <br /> 0 Other(Spec6) <br /> Measuring Equipment Used for Testing: <br /> Piping Run# Piping Run# Piping Run# <br /> Piping Material: EF <br /> Piping Manufacturer: <br /> Piping Diameter: <br /> Length of Piping Run: <br /> Product Stored: <br /> Method and location of ---- <br /> piping-run isolation: <br /> Wait time between applying <br /> pressurelvacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-R0; <br /> Pass/Fail Threshold: <br /> 7 .£z <br /> MMEEd <br /> Comments- (inchrde informatron on repairs made prior to testing) <br /> SWRCB <br /> December 2001 <br />