Laserfiche WebLink
F. In-Tank Gauging I SIR Equipment: Check this box if tank ganging is used only for inventory control. <br /> J Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the followi2g checklist. <br /> Ll Yes Q No$ Has all input wiring been inspected for proper entry and termination including tesung for ground faults? <br /> ❑ Yes U No* Were alt teak gagging probes visually tnspeeW for damage and testd—buildup? <br /> Cl Yes Q Nox Was accuracy of system product levet readings tested? <br /> Q Yes Cl No* Was accuracy of system water level readings tested? <br /> U Yes Q No* Were all probes reinstalled properly? <br /> Yes Q No* R'ere all items on the equipment manufacturer's maintenance d cklist completed? <br /> In the Section i3,below,desen'be how and when these defidencies=or wt0 be coerceted. <br /> G. Line Leak Detectors CLLD)- Q Check this box if LLDs are rot installed- <br /> Complete <br /> nstalled.Com lete the follow!jxg checldist: <br /> \ Fes No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> Q NIA (Check all that apply) Simulated leak rwe:,R3 g_p.h: Q 0.t g ph: Q 01 g_pit. <br /> 9Yes Q No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 4,Yes ❑ No* Was the testing apparatus properly calibrated? <br /> 5k Yea ❑ No* For raechamcal LLDs,does the LLD restrict product flow if it detects a leak? <br /> Q NIA <br /> Yrs Q Ivo' For electronic LLDs,does the turbine automatically shat off if the ILD d emcts a leak? <br /> Q NIA <br /> ❑ Yes Q No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring systetn is disabled <br /> n N(A ar dixomtea.t A? <br /> Q Yes O No* For electronic U.Ds,does the nubine summaticaily shat off if any portion of the monitoring system malfimcuons <br /> Q NIA or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs.have all acetssible wiring connections been visually inspected? <br /> Q N(-4, <br /> Yes Q No' I Were all items on the equipment maw ctram s maintenance checklist completed? <br /> m In Q-Sectwa Fl,betovt,descrihe hove and when these d:tnVeneies aete or Will be cnereetad_ <br /> H. Comments: <br /> Page3d3 03/p: <br />