My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1998-2003
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
1434
>
2300 - Underground Storage Tank Program
>
PR0231465
>
COMPLIANCE INFO 1998-2003
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/20/2023 10:49:21 AM
Creation date
11/8/2018 10:02:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1998-2003
RECORD_ID
PR0231465
PE
2361
FACILITY_ID
FA0003739
STREET_NUMBER
1434
Direction
W
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95337
CURRENT_STATUS
01
SITE_LOCATION
1434 W Yosemite Ave
P_LOCATION
04
P_DISTRICT
005
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\1434\PR0231465\COMPLIANCE INFO 1998-2003.PDF
QuestysFileName
COMPLIANCE INFO 1998-2003
QuestysRecordDate
6/26/2017 11:25:13 PM
QuestysRecordID
3467494
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
268
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
F. In-Tank Gauging I SIR Equipment: Check this box if tank ganging is used only for inventory control. <br /> J Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Complete the followi2g checklist. <br /> Ll Yes Q No$ Has all input wiring been inspected for proper entry and termination including tesung for ground faults? <br /> ❑ Yes U No* Were alt teak gagging probes visually tnspeeW for damage and testd—buildup? <br /> Cl Yes Q Nox Was accuracy of system product levet readings tested? <br /> Q Yes Cl No* Was accuracy of system water level readings tested? <br /> U Yes Q No* Were all probes reinstalled properly? <br /> Yes Q No* R'ere all items on the equipment manufacturer's maintenance d cklist completed? <br /> In the Section i3,below,desen'be how and when these defidencies=or wt0 be coerceted. <br /> G. Line Leak Detectors CLLD)- Q Check this box if LLDs are rot installed- <br /> Complete <br /> nstalled.Com lete the follow!jxg checldist: <br /> \ Fes No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> Q NIA (Check all that apply) Simulated leak rwe:,R3 g_p.h: Q 0.t g ph: Q 01 g_pit. <br /> 9Yes Q No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> 4,Yes ❑ No* Was the testing apparatus properly calibrated? <br /> 5k Yea ❑ No* For raechamcal LLDs,does the LLD restrict product flow if it detects a leak? <br /> Q NIA <br /> Yrs Q Ivo' For electronic LLDs,does the turbine automatically shat off if the ILD d emcts a leak? <br /> Q NIA <br /> ❑ Yes Q No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring systetn is disabled <br /> n N(A ar dixomtea.t A? <br /> Q Yes O No* For electronic U.Ds,does the nubine summaticaily shat off if any portion of the monitoring system malfimcuons <br /> Q NIA or fails a test? <br /> ❑ Yes ❑ No* For electronic LLDs.have all acetssible wiring connections been visually inspected? <br /> Q N(-4, <br /> Yes Q No' I Were all items on the equipment maw ctram s maintenance checklist completed? <br /> m In Q-Sectwa Fl,betovt,descrihe hove and when these d:tnVeneies aete or Will be cnereetad_ <br /> H. Comments: <br /> Page3d3 03/p: <br />
The URL can be used to link to this page
Your browser does not support the video tag.