Laserfiche WebLink
7. Submittals Reviewed: <br /> • (a) Submittal No. (b) Spec/Plan Reference (c) By Whom (d) Action <br /> 8. Offsite surveillance activities, including action taken: <br /> 9. Job Safety: (Report violations; corrective instructions given; corrective actions taken)_ <br /> • <br /> 10. Remarks: (Instructions received or given. Conflict(s) in Plans and/or specifications). <br /> Contractors Verification: On behalf of the Contractor, I certify this report is complete and <br /> correct, and all materials and equipment used and work performed during this reporting period <br /> are in compliance with the contract plans and specifications, to the best of my knowledge, <br /> except as noted above. <br /> Authorized COC Rep at Site Date <br />