Laserfiche WebLink
SWRCB,January 2002 Page_of <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: X Piping Manufacturer ❑Industry Standard ❑Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: X Pressure ❑Vacuum ❑Hydrostatic <br /> ❑other(Spec) <br /> Test Equipment Used:Pressure Gauges in Psi/Nitrogen Equipment Resolution: 1110-15 Psi <br /> Piping Run#1 Piping Run#2 Piping Run#3 Piping Run# <br /> Piping Material: Fiberglass Fiberglass Fiberglass <br /> Piping Manufacturer: Smith Smith Smith <br /> Piping Diameter: 3" 3" 3" <br /> Length of Piping Run: Approx. 100' Approx. 110' Approx.50' <br /> Product Stored: Regular 87 Regular 87 Diesel <br /> Method and location of Clam Shell Test port Clam Shell Test port Clam Shell Test port <br /> piping- n isolation: at Piping Sump#1 at Piping Sump#2 at Piping Sump#2 <br /> Wait time between applying 15 Minutes 15 Minutes 15 Minutes <br /> pressure and starting test: <br /> Test Start Time: 11:05 11:10 11:15 <br /> Initial Reading(R,): 5 Psi 5 Psi 5 Psi <br /> Test End Time: 12:05 12:10 12:15 <br /> Final Reading(RF): 5 Psi 5 Psi 5 Psi <br /> Test Duration: 1 Hour I Hour 1 Hour <br /> Change in Reading(RF-R,): 0 Psi 0 Psi 0 Psi <br /> Pass/Fail Threshold or No detectable loss No detectable loss No detectable loss <br /> Criteria: <br /> Test Result: X Pass ❑Fail X Pass ❑Fail X Pass ❑Fail ❑Pass ❑Fail <br /> Comments—(include information on repairs made prior to testing and recommended follow-up for failed tests) <br />