Laserfiche WebLink
Oct 26 10 09:29p Francene Escobar 200g254539 p.4 <br /> ' Installation of the LD-2000 & LD-2200 <br /> Leak Detectors <br /> Paee 2 <br /> 6. Apply pipe sealant to the threads of the 90 degree compression fitting and install into <br /> the top of the leak detector. Tighten firmly, but do not over-tighten. <br /> 7. Remove the 1/4" pipe plug from the tank test port on the submersible pump. Install <br /> the straight compression fitting into this port. <br /> 8. Install the copper tube into the compression fittings. Tighten firmly, but do not over- <br /> tighten. <br /> 9. Turn on submersible pump power. <br /> 10. Turn pump on at dispenser. Check tightness of leak detector to assure there are no <br /> leaks. <br /> 11. Slowly open ball valve at discharge of turbine. <br /> 12. Test leak detector in the system as per theLDT-890Installation & Operation Protocol. <br /> If a VMI leak detector fails to detect a leak in the line system, please follow the <br /> instructions on Adjustment of VMI Leak Detector dated March 28`x, 2005. This is <br /> included with your leak detector or can be located on our website at <br /> www.vaporiess.com under Technical Bulletins: Technical Bulletin 032805 <br /> Adjustment of VMI Leak Detector. <br /> Vaporless Manufacturing,Inc. <br /> 8700 East Long Mean Drive,Prescott Valley,Arizona 863I4 <br /> 800-367-0185 928-775-5191 Fax: 928-775-5309 <br /> Email: vmira�vaporless.com Website: www.vaoorless.com <br />