Laserfiche WebLink
F. In-Tank Ganging/SIR Equipment: ❑ Check this box if tank gauging is used only for inventory control. <br /> ❑ Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com lete the following checklist: <br /> 2-Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br /> Yes ❑ No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> Zf Yes ❑ No* Was accuracy of system product level readings tested? <br /> Yes ❑ No* Was accuracy of system water level readings tested? <br /> Yes ❑ No* Were all probes reinstalled properly? <br /> es ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> G. Linc Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br /> Com le[e the following checklist: <br /> IT-Yes ❑ No* For equipment start-up cr annual equipment certification, was a leak simulated to verify LLD performance? <br /> ❑ N/A (Check all that apply) Simulated leak rate: 5-5-g.p.h.; ❑0.1 g.p.h; ❑0.2 g.p.h. <br /> ❑ Yes firm <br /> No* -Were all LLDs coned operational and accurate within regulatory requirements? <br /> Yes ❑ No* Was the testing apparatus properly calibrated? <br /> ❑ Yes No* For mechanical LLD,,does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ❑ Yes ❑ Nom�* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> CTN/A <br /> ❑ Yes ❑ NN * For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system is disabled <br /> CSN/A or disconnected? <br /> ❑ Yes ❑Flo* For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system malfunctions <br /> U N/A or fails a test? <br /> ❑ Yes ❑ >e* For electronic LLDs,have all accessible wiring connections been visually inspected? <br /> CT N/A <br /> Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H,below,describe how and when these deficiencies were or will be corrected. <br /> R. Comments: 4G L0 '3 <br /> Page 3 of 3 03MI <br />