Laserfiche WebLink
SWRCB,January 2002 <br /> Page_of_ <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed$y: I I Piping Manufacturer ❑industry Standard Ll Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: ssure ❑Vacuum <br /> ❑Hydrostatic <br /> ❑Other(5pecoy) <br /> Test Equipment Used: T •� Equipment Resolution: <br /> Piping Run# Piping Run#_5:p, Piping Run Piping Run# <br /> Piping Material: <br /> Piping Manufacturer. �� G C% •l/ ' <br /> Piping Diameter. p �r <br /> Length of Piping Run: —1 73' S <br /> Product Stored: o' <br /> /• p <br /> Method and location of <br /> in4-tun isolation: <br /> Wait time between a1 n <br /> PP ng <br /> uml <br /> pressurelvacuwateranes <br /> startin test: <br /> Test Start Time: <br /> Initial Reading(R,): <br /> 3 <br /> Test End Time: . <br /> Final Reading(Rr): <br /> Test Duration: ✓ <br /> Change in Reading(Rt <br /> -R,): - <br /> Plass/Fail Threshold or <br /> Criteria: <br /> Test Result 99 liess ❑Fai! ❑ Pass ®.Fail q Pass 0 Fail q pass 0 Fail <br /> COMINeRts—(include information on re airs made prior to resting; and recommendedfollow-r, for alfed tests <br /> r <br /> E "d S*ELLZ6916 uoysnti 4310�1 et,i : It 90 10 now <br />