Laserfiche WebLink
NOWSWRCB,January 2002 Page_of <br /> 6. PIPING SUMP aSTING <br /> Test Method Developed By: O Sump Manufacturer p4ndustry Standard O Professional Engineer <br /> O Other(Specify) <br /> Test Method Used: O Pressure D vacuum 94ydrostatic <br /> D Other(.Spec) <br /> Test Equipment Used: Equipment Resolution: <br /> Samp# Sump# Sump# t4jw Sump# <br /> Sump Diameter: <br /> Sump Depth: <br /> Sump Material: <br /> Height from Tank Top to Top of <br /> Highest Piping Penetration: 7 <br /> Height from Tank Top to Lowest N <br /> Electrical Penetration: <br /> Condition of sump prior to testing: <br /> Portion of Sump Tested <br /> Does turbine shut down when <br /> sump sensor detects liquid(both O/es O No O NA 6A'es O No D NA PfYes D No O NA D Yes O No O NA <br /> product and water)?* <br /> Turbine shutdown response time tea" <br /> Is system programmed for fail-safe OPfes ONo [INA Woes DNo DNA P4es ONo DNA OYes ONo DNA <br /> shutdown?' <br /> Was fail-safe verified to be W fes ONo DNA &Wes ONo DNA ZKes ONo DNA D Yes DNo DNA <br /> operational?' <br /> Wait time between applying <br /> pressure/vacuum/water and starting <br /> test: /7 <br /> Test Start Time: <br /> Initial Reading(R,): <br /> Test End Time: d <br /> Final Reading(RF): 27.Z <br /> Test Duration: ./ <br /> Change in Reading(RF-R,): <br /> Pass/Fail Threshold or Criteria: <br /> Test Result: ❑FullPus+ O Fail WOAM O Fail O Pass, O Fail <br /> Was sensor removed for testing? a4es ONo, DNA es DNo DNA es DNo DNA O Yes ONo DNA <br /> Was sensor properly replaced and ��� VK <br /> es functional after testing? es ❑No ❑NA Id res ❑No ❑NA Pyres ❑No El NA ❑Yes ONo [INA <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' if the entire depth of the sump is not tested,specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(«)is"NO"or"NA",the entire sump must be tested. (See SWRCB LG-160) <br />