My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006 - 2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
707
>
2300 - Underground Storage Tank Program
>
PR0505151
>
COMPLIANCE INFO 2006 - 2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:09 PM
Creation date
11/8/2018 10:03:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006 - 2012
RECORD_ID
PR0505151
PE
2361
FACILITY_ID
FA0007815
FACILITY_NAME
QUICKI KLEEN CAR WASH
STREET_NUMBER
707
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
AVE
City
MANTECA
Zip
95336
CURRENT_STATUS
01
SITE_LOCATION
707 E YOSEMITE AVE
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\707\PR0505151\COMPLIANCE INFO 2006 - 2012 .PDF
QuestysFileName
COMPLIANCE INFO 2006 - 2012
QuestysRecordDate
7/19/2016 8:32:58 PM
QuestysRecordID
3145718
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
351
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin Valley Unified Air Pollution Control District <br /> Pressure Decay Test TP2O1.3 n _ <br /> Confirmation No.: — !J Testing Company: <br /> Permit No.: - Address: <br /> Site Name: <br /> Address p ` Phone: <br /> Phone: <br /> Phase I System? /Coaxial Tanks Manifolded? 1! <br /> Phase Il Systeme lan Assist/Other: ----� <br /> Total Number of Noales <br /> Nozzles for Tank#1 Nozzles for Tank#3 <br /> Nozzles for Tank#2 Norties for Tank#4 <br /> Balance"Nozzle End"hoses must be drained prior to test Number of hoses over 100mi: •T./ <br /> Tank Information 1 2 3 4 ALL <br /> 1. Product Grade r <br /> 2. Actual Tank Capacity, gallons <br /> 3. Gasoline Volume, gallons p <br /> 4. Ullage, (v) gallons(line#2 minus line 43) <br /> Test Information 1 2 3 4 5 <br /> 5. Start Time C� <br /> 6. Initial Test Pressure, inches H2O >U 0 <br /> 7. Pressure after minute, inches H2O <br /> 8. Pressure after 2 minutes, inches H2O <br /> 9. Pressure after 3 minutes, inches HZO <br /> 10. Pressure after 4 minutes, inches HZO <br /> 11. Pressure after 5 minutes, inches HZO <br /> 12 Allowable Final Pressure <br /> _ 13. Pass/Fail (Enter"GF"for Gross failure) r�4 <br /> i <br /> Nitrogen introduction point. Phase I vapor coupler or Phase 11 vapor riser. <br /> Record Vapor Coupler Integrity Test Assembly pressure after 1 minute: <br /> Type of pressure device used: <br /> Enter Calibration date for pressure(s)device(90 days) <br /> Enter initial tank ullage pressure (Vent if over 0.5 in. w.c.) <br /> Enter flowmeter rate, F (Must be 1 to 5 CFM) <br /> Enter calculated ullage fill-time-t2 tz= V <br /> Enter actual fill-time i15221F <br /> Enter ending value of drift test( Must be 0.01 in. w.c. or less) <br /> Tester: r'r7�'r-f Tester ID: <br /> Signature. Test Date: �` <br />
The URL can be used to link to this page
Your browser does not support the video tag.