Laserfiche WebLink
Comments: T <br /> items Requiring Fallow-Up Actions: <br /> Instructions, <br /> Mouthly visual inspection of the UST system must be conducted by a Designated UST Operator,who <br /> possesses a current"California UST System Operator"certification issued by the international Code <br /> Council. <br /> A copy of this monthly visual inspection checklist must be provided to the UST Owner or Operator. <br /> The Designated UST Operator must alert the UST Owner or Operator of any condition discovered during <br /> the monthly visual inspection that may require follow-up actions. <br /> The UST Owner or Operator must maintain a copy of this monthly visual inspection checklist and all <br /> attachments for the previous 12 months. The records must be maintained on-site or,if approved by the <br /> local agency,off-site at a readily available location. <br /> Puge 7,of 2 ScpLcuibt'ir 2014 <br /> ST/6'd ££7£89t,602:01 :wojd 20:£0 9002-b0-190 <br />