My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
853
>
2300 - Underground Storage Tank Program
>
PR0231460
>
COMPLIANCE INFO 1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 2:52:58 PM
Creation date
11/8/2018 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0231460
PE
2381
FACILITY_ID
FA0001369
FACILITY_NAME
7-ELEVEN INC. STORE #21756
STREET_NUMBER
853
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
853 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\853\PR0231460\COMPLIANCE INFO 1985-2006.PDF
QuestysFileName
COMPLIANCE INFO 1985-2006
QuestysRecordDate
8/10/2017 4:54:42 PM
QuestysRecordID
3567749
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Simmons Corporation <br /> MONTHLY <br /> STATISTICAL INVENTORY RECONCILIATION (SIR) REPORT <br /> 'SfR pr@r a Simmons SIRVEY Corporation Phone: (972) 497-9002. <br /> $ Yerxttf �` Sir 5.7-Version 5.7.L.M. Date of SIR report: 05/29/97 <br /> Pertad Coter�d 04/97 lWhat is the required number of usable inventory days per tank?26 <br /> Southland Corporation, Inc. <br /> P.O. Box 711 <br /> Dallas, TX 75221.0711 <br /> Location#2235 -21756 Cust. Site ID:21756 Simmons Site ID:ATAUAJL <br /> TT `I' Address: Phone: <br /> DGfilfC `,tt City: State: CA I Zip: Fax: <br /> Name: Southland Corporation, Inc. _ <br /> Tank 4wt of a Address: P.O. Box 711 Phone. <br /> : 5`n : City: Dallas State: TX Zip: 75221.A711 Fax: <br /> 003# Y;1t Name: Southland Corporation, Inc. <br /> EEoYtg �.tl&tCtttf®C rir, �K�fan r; `` , ',gTj. c This Month Last Two <br /> Month Months <br /> 1�I[Iriltx�r t+1WttElreC t:z � 5 :�: : (glaliattts{ D <br /> - : Leak Minimum Calculated Pass,Fail, Pass,Fail, Pass,Fail, <br /> Threshold Detectable Leak Incon- Incon- Incon- <br /> b)�. t :c e t e : : •`� i i"; �"''P' n .•`'t"r� Leak Rate(6elusive elusive elusive <br /> i :r �� �� �'y�'�t�:) � r.,?:�elC�j�Yt•3�r s:�s Rate(6c) (Apr 97) (Mar 97) (Feb 97) <br /> :ydi'3;ae:'r; ??I:...>:�::;asx.:.,:R.;iY;.a,��:.r::::>:>.urr..:::Y:�.3;�c..,::.n:.;.• Y�:a,:::,:.:o."•o:c..l.:'.':�c...:.���':'`.`Ea 9Ph 9Ph I 9Ph P I F I I P I F1 I I PI F <br /> 1 I <br /> ATAUAJLA 21756MUL PRODUCT MUL 0 0.12 0.25 0.04 ' <br /> ATAUAJLB 21756PUL PRODUCT PUL 0 0.01 0.03 0.01 <br /> ATAUAJLC 21756RUL I PRODUCT RUL 1 01 0.09 1 0.18 -0.08 <br /> NOTE: % indicates No Analysis Performed Negative Calculated Leak Rates Indicate Gain <br /> 1.The lank owner is required to have an SIR report for each month. <br /> 2.Monthly reports must be submitted to the beat agency upon request.. <br /> 3.The tank owner is required to have the report by the 20th day of the following month. <br /> 4.If for any reason,the test is neither"pass"nor"fail",the inconclusive column will be marked. <br /> 5.The local agency may need to be notified of the tank that does not pass the SIR test within 24 hours of receipt of the report and the SIR report <br /> should be submitted to the local agency within 10 days of the report. <br /> 6.Quantitative and Qualitative Methods: <br /> a.A leak threshold,minimum detectable leak rate,and calculated leak rate must be provided for each tank. If not,then the tank failed the SIR test. <br /> b.If the calculated leak rate for lank is greater than or equal to the leak threshold,the tank failed the SIR test. <br /> c. If the minimum detectable leak rate for tank is greater than the certified performance standard(i.e.,0.1 or 0.2 gph)and the calculated leak rate <br /> is less than the leak threshold,the test is inconclusive for that month. <br /> d.Two consecutive failures and/or Inconclusives may require a tank and/or piping Integrity lest within 15 days from the date of the <br /> second report. The local agency should be contacted. <br /> 7.A conclusive result of"pass"or"fail"Is required to meet monthly leak detection requirements. <br /> Persaaranahts#tn eiralua#lorr Simmons Technician <br /> 5fgttacure�r�p#Itfrial) <br /> Date of SIR report: 05/29/97 <br /> 05/30/97 15:45:12 Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.