Laserfiche WebLink
1. Three complete sets of ors (include manufacturer's specification s* for proposed equipment to be installed). <br /> 2, a Plans drawn to scale in non-erasable print. <br /> 3. Plot plan to show location of tanks and all associated piping. <br /> 4, O( Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. CK Tank cross-sectional diagram. <br /> 6, N Detail of tank, associated piping, excavation and cover. <br /> 7, p( Tank(s) and piping approved by a nationally recognized independent testing organization. [Title 23, Chapter 16, <br /> Article 3, Section 2631 (b) & 26351 <br /> B, r_ Verification of product compatibility with the tank(s), piping, monitoring <br /> device(s), epoxy or silicone glues, etc. <br /> 9. Manufacturer's written installation instructions for tank(s), piping, monitoring devices, etc. <br /> 10. ok At the installation site, prior to installation, a tightness test shall be performed on both primary (1°) and <br /> secondary (20) containment systems before covering. (section 2635 (a) (3) & (4)) <br /> 11. C- Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to PHS-EHO from the testing company or owner of facility. (Health & safety Code, Division 20, <br /> Chapter 6.7, Section 25291 (h)1 <br /> 12. TANK COMPOSITION <br /> TANK # # 01 # 02 # # # <br /> CAPACITY 15"00o I D/OdD <br /> a <br /> MANUFACTURER cnni2mmnt GOn onlTlent <br /> COMPOSITION rJ ' <br /> elm <br /> MODEL JSTIOI5 JSTNO <br /> PRODUCT VeA. Ljt11. Pa4m. Unl. <br /> CORROSION PROTECTION HDPE HvDPm <br /> U.L. LISTED lG� <br /> COMPATIBILITY WITH 100%. <br /> METHANOL <br /> 13. TANK(s) TO BE INSTALLED <br /> O( A. Steel-clad with fiberglass reinforced plastic coatings, composites, or equivalent non-metallic exterior <br /> coatings or coverings. <br /> _ (1) Tested at the installation site using an electric resistance holiday detector. <br /> a (2) Vacuum applied to interstitial space. <br /> _ a. Fiberglass <br /> (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular (primary tank pressure test). <br /> _ C. Non-clad steel tank (section 2635 (a) (2) (A)1 <br /> _ (1) Cathodic protection provided for entire tank, piping and components (nuts, bolts, washers, <br /> etc.). <br /> _ (2) Field installed cathodic protection systems designed and certified as adequate by a <br /> corrosion specialist. <br /> (3) Impressed current systems to be inspected no less than every 60 days. <br /> 5 <br />