My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1985-2006
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
Y
>
YOSEMITE
>
853
>
2300 - Underground Storage Tank Program
>
PR0231460
>
COMPLIANCE INFO 1985-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/24/2024 2:52:58 PM
Creation date
11/8/2018 10:04:10 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1985-2006
RECORD_ID
PR0231460
PE
2381
FACILITY_ID
FA0001369
FACILITY_NAME
7-ELEVEN INC. STORE #21756
STREET_NUMBER
853
Direction
E
STREET_NAME
YOSEMITE
STREET_TYPE
Ave
City
Manteca
Zip
95336
CURRENT_STATUS
02
SITE_LOCATION
853 E Yosemite Ave
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\Y\YOSEMITE\853\PR0231460\COMPLIANCE INFO 1985-2006.PDF
QuestysFileName
COMPLIANCE INFO 1985-2006
QuestysRecordDate
8/10/2017 4:54:42 PM
QuestysRecordID
3567749
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
342
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date: Ygg � • <br /> WRITTEN MONITORING PROCEDURES <br /> UNDERGROUND STORAGE TANK MONITORING PROGRAM <br /> This monitoring program must be kept at the UST location at all times. The information on this monitoring program are <br /> conditions of the operating permit The permit holder must notify (the local aflencvl within 30 days of <br /> any changes to the monitoring procedures,unless required to obtain approval before making the change. <br /> Required by Sections 2632(d)and 2641(h)CCR- <br /> Facility <br /> CRFacility Name ;xltFyllato q- EjeWA *al 1751, r- <br /> Facility Address Y53 astUo-,,o �n <br /> ri IYik� e2(17TgktiI G <br /> A Describe the frequency of performing the monitoring: <br /> Tank i rcn+hiap 5 ftkniftLiium <br /> PpinCon i tnrlen5 YYl�ni�,2ina <br /> B. What methods and equipment, identified by name and model, will be used for performing the <br /> monitoring: <br /> Tank -rfd 1 070 3_ ; .Enfem- ilialLi tudjg 1. r*3o)- '-CQ7 <br /> A-LtoTitnKlnt, a Pncbe Kit 0:401-W09-00I <br /> Piping yAl4^rktb kekk Detktlt2 LD2CC0 <br /> C. Describe the location(s) where the monitoring will be performed (facility plot plan should be <br /> attached): <br /> See tkAyhed 6t4 plan d(O %ank Wail She 15 <br /> D. List the name(s) and title(s) of the people responsible for performing the monitoring and/or <br /> maintaining the equipment. <br /> Oi�2nek: &wh)and&R4x&. en <br /> Opeilator' Rose. I'(flA.oA <br /> E. Reporting Format for monitoring: <br /> Tark-I inve.nio,ew e +i ,W. ' /Y1R in Id i at 5fct2 N "l 5ic>et <br /> Piping: Enyllecn ental (grAer'ehenjiye MAnuoj' zt Cfijh Ob <br /> F. Describe the preventative maintenance schedule for the monitoring equipment. Note: <br /> Maintenance must be in accordance with the manufacturers' maintenance schedule but <br /> not less than every 12 months. Amua I <br /> G. Describe the training necessary for the operation of UST system, including piping, and the <br /> monitoring equipment:"In Siege f i ilpl&A zrtitrtl Ci MnP-llznsiVe nlitu.l° ftj* htihed <br /> fCP-VAlni , fttl al i)' ec <br /> 2 la 3 itn Y 4 'TAn K9 a rd Lie ns es <br /> 5 C'uYhaiic r>rht�i0t1 G)ynvenbee.�I�eCbACilbaticn 7)5tcJ1 <br /> 8) Pkp iz and main+err re, Rew 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.