Laserfiche WebLink
Page of <br /> SWRCB,January 2002 TEcTING <br /> l�3NDER DISPENSER C0jgTAE%jMM x professional Engineer <br /> UDC Manufacturer industry Standard <br /> Test Method Developed By: <br /> Other(�pwO} X Hydrostatic <br /> Test Method Used: <br /> Pressors Vacaum <br /> oftr{Spew} <br /> Equipment Resolution: <br /> Test Equipment Used:INCQN TS-STS UDC# <br /> UDC# 9110 UDC#11112 UDC# <br /> WESTERN WESTERN <br /> UDC Maan�u�fjacturer: FRP 1~RP <br /> UDC Maerial: 3112 3111 <br /> UDC D the 10„ 10" <br /> Height from UDC Bottom to Top <br /> of Hi est Pi ing Penetration: 3„ 3" <br /> Hight from UDC Bottom to <br /> Lowest Electrical Penetration. <br /> Condition of UDC prior to CLEANIDRY CLEANIDRY <br /> testis : I4„ 14" <br /> UDC <br /> Portion of Tested] 14' <br /> Does turhine shut down when X Yes u Na GNA <br /> UDC sensor detects liquid(hath X Yes C7 No C]NA X Yes ONO U NA X Yes Ll No DNA <br /> roduct and water?' 15 see 15 sec 15 sec <br /> Turbine shutdown res onse ti- 15 sec <br /> is system programmed far fail- X Yes u No U NA X Yes f]Na d NA XYes Q No t]NA X Yes 0 No DNA <br /> safe shutdown'?' <br /> Was fail-safe verified to be X Yes 0 No ❑NA X Yes GNo DNA <br /> X Yes Q No l7 NA XYes []Na ❑NA <br /> e rational?' <br /> Wait time between applying 30 gain 30 min. 30 min <br /> pressuretvactmm1water and 30 min <br /> starting test 10:17 AM 10:17 AM <br /> Test Start Time 4.2784 <br /> Initial Readin 314::32 Aii+l 10:32 AM <br /> Test End Time: 32 <br /> 33134 427$2 <br /> . 15 min <br /> Test Duration: 1 <br /> Final R 15 min 15 min <br /> 5 min <br /> Chan a in Rea ' Ri : 0t102 ..042 - .002 <br /> as <br /> PslFail Threshold or Criteria: .002 .042 .002 <br /> Test Result,. <br /> K Piss ❑Fail X Pass ❑Fail Pass ❑Fail Puss ©Fail <br /> t <br /> Was sensor removed fortes' X Yes n No U NA X Yes O No O NA XYes C]No DNA <br /> X Yes DNo ❑NA <br /> Was sensor properly replaced and X Yes f]No DNA X Yes ❑No ❑NA X Yes ❑No ❑NA X Yes []No DNA <br /> verified functional after testis <br /> Comment:t include inform on re airs made prior to testingar:d recommended Ilow- or ailed tests <br /> -- <br /> 0 If the entire depth of the UDC is not tested,specify how much was tested. If the answer to M of the questions indicated with an <br /> asterisk(s)is"NO"or"NA",the entire UDC must be tested (See SIVRCB LG-160) <br />