My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FLAG CITY
>
14931
>
2300 - Underground Storage Tank Program
>
PR0506221
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2021 2:21:44 PM
Creation date
11/8/2018 10:21:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0506221
PE
2361
FACILITY_ID
FA0007287
FACILITY_NAME
LODI OIL INC ARCO #83680
STREET_NUMBER
14931
Direction
N
STREET_NAME
FLAG CITY
STREET_TYPE
BLVD
City
LODI
Zip
95242
CURRENT_STATUS
01
SITE_LOCATION
14931 N FLAG CITY BLVD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\kblackwell
Supplemental fields
FilePath
\MIGRATIONS3\F\FLAG CITY\14931\PR0506221\COMPLIANCE INFO 2016 - PRESENT .PDF
QuestysFileName
COMPLIANCE INFO 2016 - PRESENT
QuestysRecordDate
8/10/2016 11:53:37 PM
QuestysRecordID
3164257
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2442 Page of <br /> 9. sPnLiJovERF1 L.L CONTAIl�fMENT Boxr <br /> Facility is Not Equipped With S i LOverFiil Containment Boxes 0 <br /> Spill/overfill Containment Boxes are Present,but were Not"Tested ❑ <br /> Test Method Developed 13y: []Spill Bucket Manufacturer :i Industry Standard 0 Professional Engineer <br /> ❑tither(Sped) <br /> Test Method Used: n Pressute i 1 Vacuum ❑Hydrostatic <br /> . []other Specify} <br /> Test Equipment Used: Equipment Resolution: <br /> Spill Box# Spill Hex# Spill Box# Spill$az# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vactium/water and <br /> St utin test: <br /> Test Start Time: <br /> Initial Reading{R&. <br /> Test End Time: <br /> Final Reading <br /> Test Duration: <br /> Change in Reading{R�-Ar]: <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result. 13Pass ❑Fail ❑ Pass ❑Fail 0 Pass ❑Fail [I pan ❑Fail <br /> Comments— 1rrcIude' orrnario►r on repairs made rior to testin and recvrnmended allow-u or atled tests <br /> w <br /> r <br /> t <br />
The URL can be used to link to this page
Your browser does not support the video tag.