My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
F
>
FREMONT
>
5000
>
2300 - Underground Storage Tank Program
>
PR0231553
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2021 11:12:28 AM
Creation date
11/8/2018 10:21:22 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2019
RECORD_ID
PR0231553
PE
2381
FACILITY_ID
FA0003907
FACILITY_NAME
PANELLA TRUCKING LLC
STREET_NUMBER
5000
Direction
E
STREET_NAME
FREMONT
STREET_TYPE
ST
City
STOCKTON
Zip
95215
APN
14330001
CURRENT_STATUS
02
SITE_LOCATION
5000 E FREMONT ST
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\F\FREMONT\5000\PR0231553\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
262
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 . Owner-Operator and its contractors, subcontractors, and <br /> any other third party involved, and each and all of them, agree to <br /> hold Contractor free and harmless from any and all liability, <br /> loss, cost, expense, or damage, including consequential damages, <br /> in any way arising in any way in connection with this Agreement or <br /> any attempted corrective or remedial action undertaken by <br /> Owner-Operator or its contractors, subcontractors, or any other <br /> third party, except only for any liability which may arise from <br /> Contractor' s sole negligence or willful misconduct. <br /> 7 . Any tank to be tested by Contractor must be filled by <br /> Owner-Operator to capacity plus four (4) inches into the <br /> respective fillpiping, and allowed to remain static for a minimum <br /> of three (3) hours prior to Contractors arrival. Owner-Operator <br /> must provide an additional twenty (20) gallons in a separate <br /> container for standpipe fill or makeup purposes. If any line <br /> including but not limited to, abandoned lines, or permanent fill <br /> tube extensions must be capped or modified in any way, or if any <br /> buried manhole or any other vapor trap must be vented, such action <br /> shall be the sole responsibility of the owner-Operator. It shall <br /> be the sole responsibility of the Owner-Operator to verify that <br /> the information as shown in paragraph two (2) is accurate and <br /> correct, and to advise the contractor if the existing ground water <br /> level is above the bottom of the storage tank. <br /> 8 . If the Owner-Operator does not, for any reason, have the <br /> tank (s) ready for testing upon the arrival of Contractor' s testing <br /> crew, Owner-Operator shall pay Contractor for any waiting time, <br /> &/or lost time at the rate of $42 .50 per manhour. If a not tight <br /> system condition is determined and the Owner-Operator desires to <br /> have Contractor further investigate the source (s) &/or effect <br /> repair(s) ; Contractor shall conduct such extra work at the rate of <br /> $42 .50 per manhour plus the cost of repair materials as needed. <br /> Retests are not included in this agreement. <br /> CONTRACTOR OWNER-OPERATOR <br /> Integrity Tank Testing Services, Panella Trucking, Inc. <br /> a Business Trust <br /> 166 Frank West Circle P. 0. Box 5010 <br /> Stockton, California 95206 Stockton Ca. 95205 <br /> - <br /> by Bill Savage by <br /> Manager <br /> title title <br /> 4/5/91 <br /> date date <br /> Curly Lawrence 943-5000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.