My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 4:48:12 PM
Creation date
11/8/2018 10:21:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2006-2012.PDF
QuestysFileName
COMPLIANCE INFO 2006-2012
QuestysRecordDate
7/5/2017 10:08:33 PM
QuestysRecordID
3482644
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
If ever required,the <br /> pump can be easily <br /> removed from the tank IM:Our intake <br /> by unthreading three filter screen <br /> bolts.There is no need to option utilizes <br /> disconnect the syphon 316 stainless steel <br /> system,or remove the to filter particles Avp-- r� <br /> leak detector from the .009"(.2.3tmn)and - <br /> system to service the IST larger.It can significantly reduce dispenser <br /> filter changes,reducing maintenance costs by <br /> hundreds of dollars per year. <br /> T=his reduces the risk of correcting one problem and power Regoaenents: <br /> causing another. •Input power. <br /> At 4 hp,-MKM0 3 phase W60 Ilz <br /> .At 2 hp,20&230 volt 60/60 Hz I or 3 phase <br /> •Mety%W,output power.3 phase variable frequency <br /> Pump Motor. <br /> The MngVFC incorporates <br /> •2 HP of 4 HP:2 stage centrBmgal pump <br /> a RS 485 serial •Maxumu m liquid visLvsity: <br /> communications system 70 SSU @ 60 eleg F(15.5 deg C) <br /> for communication and •Alaxnmrun flow.rate:2 hp 110 GPM,4 hp 190 GPM <br /> intelligence sharing with •Maxunum pressure: 1:36 feet of head <br /> INCON fuel management (45 PSI in gasoline) <br /> systems. •Maximum amperage: 2 hp 13 amps.4 hp 18 amps <br /> AN <br /> Check Valve: <br /> •2 314"(70nmi) diameter ahnminmvsteel construction <br /> 100%akxrhollgas compatible fluorocarbon rocarbon sell. <br /> Seel Elastomers: <br /> •Standard seals are viton and compatible with fuel <br /> _ micitures containing up to 15%ethanol or methanol <br /> Pump diagnostics is reported moments to remote with gpsohne and 2(N.' 1AITBE,1714,ETSE,or 17% <br /> monitoring parties, reducing service call time. Serial link TAME with gasoline,awl dieM heels.avgas,jet.luel <br /> allows ATG to control pump preventing water from being orkenasene <br /> pumped, elimination of syphon piping, and other functions •.AG ma:lels c(otain'9S9"'in model number and are for <br /> designed to reduce station operating costs. use in heel mixtures containing any combination of <br /> tthanul or methanol and 20%MTBE.20%ETBF,or <br /> 17%TAME with gasoline. <br /> ;�RlflflEl Syphoa: <br /> •1\vphos primer is venture type,capable of 26"(66c i) <br /> Hg vacuum <br /> •.%Tbm check valve is machined aluminum,field <br /> -- _ repairable <br /> �_c - `• i - _ Variable Speed ContrroRer: <br /> �--:� - •Alternating lead pump and master>slave capability,. <br /> On dejvuuKl"auto-start"of additional pumps in <br /> - mamfolded n VaVP .hmxs <br /> e •Enclosure size is 12"H x 5'W x 9.25'D <br /> (30(in x13cmx23cin) <br /> •Operating temperature 4t)to 95 deg F <br /> (4W35deg C) <br /> Approvals: <br /> •CL and CUL;others pending <br /> Quality Certification: <br /> FE Petro s quality commitment to supply you with a world •ISE Petro is an NO Nil Certifier)manufacturer. <br /> class product int accordance with internationally recognized <br /> quality standards. <br />
The URL can be used to link to this page
Your browser does not support the video tag.