My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2006-2012
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2006-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/25/2021 4:48:12 PM
Creation date
11/8/2018 10:21:49 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2006-2012
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2006-2012.PDF
QuestysFileName
COMPLIANCE INFO 2006-2012
QuestysRecordDate
7/5/2017 10:08:33 PM
QuestysRecordID
3482644
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
418
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility Name: Costco # 658 Tracy (Page 3) <br /> In-Tank Gauging: <br /> ®Check this box if tank gauging is used only for inventory control and disregard the following section. <br /> Complete the following checklist: <br /> ❑Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground <br /> faults? <br /> ❑Yes ❑ No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> El Yes ❑ No Was accuracy of system product level readings tested? <br /> ❑Yes ❑ No* Was accuracy of system water level readings tested? <br /> ❑Yes ❑ No Were all probes reinstalled properly? <br /> ❑Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> ❑ Check this box if LLDs are not installed and disregard the following section. <br /> ®Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD <br /> ❑ N/A performance? (Check a//that app/y) Simulated leak rate: ® 3 gph.; ❑ 0.1 gph ; ❑ 0.2 <br /> h. <br /> ®Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ®Yes ❑ No Was the testing apparatus properly calibrated? <br /> ❑Yes ❑ No For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ® N/A <br /> ®Yes No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ®Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A is disabled or disconnected? <br /> ®Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ® N/A malfunctions or fails a test? <br /> ®Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ®Yes ❑ No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: No Deficiencies. The facility is in compliance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.