My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2021 4:34:29 PM
Creation date
11/8/2018 10:21:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2013-2015.PDF
QuestysFileName
COMPLIANCE INFO 2013-2015
QuestysRecordDate
7/5/2017 11:14:25 PM
QuestysRecordID
3483232
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. UNDEF ' ISPENSER CONTAINMETING T <br /> dNT (UDC ofessional Engineer <br /> Test Method Developed By: [QDC Manufacturer ® try <br /> Standard— <br /> ❑ Other(Specify) <br /> Test Method Used: ❑ <br /> Pressure ❑ Vacuum ®Hydrostatic <br /> ❑ Other(Specify) <br /> Test�1m Equipment Resolution: +/-0.002" <br /> Cut Used: Incon TS-STS Sump Test System <br /> C# 1/2 UDC# 3/4 UDC# UDC# <br /> UDC Manufacturer: <br /> UDC Material: Plastic Plastic <br /> UDC Depth: <br /> 30" 30" - — <br /> Height from UDC Bottom to Top 8„ 8" <br /> of Hi est Pi in Penetration: <br /> Height from UDC Bottom to 5" 5" DEC 14 2015 <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Fair Fair F <br /> testis <br /> Portion of UDC Tested 4"Above Pen. 4" Above Pen. N pITV nCO�OT �C�IT <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No U NA ❑Yes❑No U NA ❑Yes❑No U NA ❑Yes❑No U NA <br /> product and water)? <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail- ❑Yes❑ No U NA ❑ Yes❑ No U NA ❑Yes❑No U NA ❑Yes❑ No E NA <br /> safe shutdown? <br /> Was fail-safe verified to be ❑Yes❑No U NA ❑Yes❑ No ®NA ❑ Yes ❑No ®NA ❑Yes❑No U NA <br /> operational? <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes <br /> starung test <br /> Test Start Time: 10:01 AM 10:01 AM <br /> Initial Reading(R): 1.5049 5.3724 <br /> Test End Time: 10:16 AM 10:16 AM <br /> Final Reading(RF): 1.4472 5.3732 <br /> Test Duration: 15 min. 15 min. <br /> Change in Reading(RF-P): -0.0577 0.0008 <br /> Pass/Fail Threshold or Criteria: +/-0.002 +/-0.002 <br /> Test Result: Fail Pass <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced and <br /> verified functional after testing? I Yes Yes <br /> Comments— (include information on repairs made prior to test ng, and recommended follow-up for failed tests) <br /> Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment Testing scope of work. <br /> If the entire depth of the UDC is not tested, specify how much was tested. If the answer to any of the questions indicated with an <br /> asterisk(s)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.