My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2021 4:34:29 PM
Creation date
11/8/2018 10:21:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2013-2015.PDF
QuestysFileName
COMPLIANCE INFO 2013-2015
QuestysRecordDate
7/5/2017 11:14:25 PM
QuestysRecordID
3483232
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Designated Underground Storage Tank (UST) Operator <br /> Monthly Visual Inspection Checklist <br /> Facility Name: COSTCO 0658 j Date: 2/10/2015 <br /> Facility Address: 3250 w.Grsaume Rd <br /> City:Tracy Zip Code: 95377 1 <br /> Designakd UST Opmwr Conducting the Inspection: Gabriel Martin <br /> In-'em <br /> ode Council Certification 8: 8260320 Expiration Date: 6/5/2016 <br /> Signature: Phone: (949)460-5200 <br /> Nn,NA-Not Applicable <br /> Item MONITORING PANEL/ALARM HISTORY y 1q NA <br /> 1 Monitoring System is powered an and in proper operating marc X <br /> 2 Monitoring system is nut currently showing any alarms or warnings. X <br /> 3 Alarm history reportflog for the previous month is available,and has been reviewed by the Designated UST X <br /> Operator. (Attach a copy of the alarm history reporVlog to this form if available.) <br /> 4 Each alarm for the previous month has been responded to appropriately. X <br /> 5 Sensors located in tank-top containment sumps have not alzrmed in the past month. X <br /> 5a - List all talc-top sumps where alarms occurred in the past month: <br /> 2/7:8711 F111 Somp-Hydro <br /> Nnte Sonya wkem an alum has u o,,rcd in Ar past month nuor Ire motrcird uttese a qualgied semicv twhnidan responded to.and pevparly <br /> adsbereed,rke eaare ofthc alarm Altarh darumrnmtiml wr fcilta appropriate aer.ite to this report.Ifsump inspection is mquiod,record rmulu <br /> In item 6,below <br /> UST SYSTEM 1\SPECTION <br /> 6 Tank-top containment sumps arc free of water,debris,and hazardous substance. Sensors are located properly. <br /> Npe Nuallnrtm-non y rrnpt u e.MY.ryrnN nn,mru rhen an atamr Aa.rc.urmd in tkrpm muMA fo.rlirh rArm n n rervuere....M <br /> Y Y N <br /> Sump Location: "'A Sump Lr imorc N'• <br /> Sump Location: "'A <br /> Sump Location., "`A <br /> Sump Location: wA i Sump Location: <br /> 7 Spill containment structures are free of water,debris,and hazardous substance. <br /> Y !n I V N NA <br /> Tank-877VX Tartk9/ X <br /> Tank-87S X Tank-Additive Tank X <br /> 8 Under-dispenser containment areas arc free of water,debris,and hazardous substance. Sensors are located properly. <br /> V N NA V N NA <br /> Dispenser-//2 X Disperuer-9/10 X <br /> Dispenser-314 X L I Dispenser-11/12 X <br /> Dirpenserv516 X <br /> Dispenter-7/8 X <br /> PAPERWORK INSPECTION Y N NA DATE DONE <br /> 9 Monitoring system certification has been completed within past 12 months. EBX E9/25/1410 Secondary containment tests have been completed within the required timcl'mX11 Spill containment swcture(bucket)testing was completed within the past year12 Tank tightness testing was completed within required timeframe. Xl3 Line tightness testing was completed within required timeframe. X <br /> 14 Other required testing/maintemmuc was completed within required fimcfrxme.(List tesUntaintenmcc items below) <br /> TestlMaituenance. X MA <br /> TestLMainlenance: X WA <br /> TestlMaintenance: X N/A <br /> FACILITYEMPLOYEE TRAINING Y N I NA <br /> 15 1 All facility employees have received the required on-the-job training within the past year. X <br /> 16 1 All facility employees hired within the past 30 days have received the required on-the-job training. X <br /> Note: Any answer of"N^should be explained in the comment section on the following page,and will require follow-up <br /> action. <br /> Page I of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.