My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 2013-2015
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO 2013-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2021 4:34:29 PM
Creation date
11/8/2018 10:21:51 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2013-2015
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2013-2015.PDF
QuestysFileName
COMPLIANCE INFO 2013-2015
QuestysRecordDate
7/5/2017 11:14:25 PM
QuestysRecordID
3483232
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
314
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thuy Tran [EH] <br /> From: Andy Lamas<alamas@wpinc.com> <br /> Sent: Friday, May 31, 2013 10:08 AM <br /> To: 'Alexia Inigues'; Thuy Tran [EH] <br /> Cc: Sue Hulse(shulse@jonescovey.com); Walt Friesen; Paul Gorton; Marissa Boothe <br /> Subject: RE: CA-Tracy Costco#658 Fuel Additive/CUPA Authorization to start additizing and outstanding As- <br /> Builts from Contractor/BCE#10050 <br /> Attachments: Red Line Tracy Costco.pdf <br /> Good morning Alexia, <br /> Thuy Tran has been included in our correspondence, per her request I've attached the red line drawings showing the <br /> FRP&electrical conduit run changes. If Ms.Tran finds that additional efforts to the drawings need to be made, please <br /> make the changes per the document attached and send the corrected drawings to Ms.Tran.Thank you for your help <br /> and please feel free to call me if you have additional questions or concerns. Have a great weekend. <br /> Sincerely, <br /> f{t4 Zam" <br /> Project Manager <br /> Cell (714) 398-2180 <br /> Office (714) 826-0352 ext. 3393 <br /> WAYNE PERRY, INC. <br /> a <br /> Environmental Remediation, Construction and Consulting <br /> From: Alexia Inigues [mailto:ainigues@barghausen.com] <br /> Sent: Thursday, May 30, 2013 2:10 PM <br /> To: Paul Gorton; Andy Lamas; Sue Hulse; Walt Friesen <br /> Cc: Briana Armstrong; File; Moises Iniguez; John Ellingsen; Chris Tebaldi; Jay Grubb; Mandi Jackson; Tim Hurlocker; <br /> Dennis Bock <br /> Subject: CA-Tracy Costco #658 Fuel Additive/ CUPA Authorization to start additizing and outstanding As-Builts from <br /> Contractor/ BCE #10050 <br /> Importance: High <br /> Paul: the CUPA Inspector has approved this site to start operating the Fuel Additive equipment with the condition that <br /> the contractor submit the As-Builts. <br /> Andy: Please note that Thuy Tran (CUPA) still needs the As-Builts for this site. Please contact her and coordination these <br /> items. Our office will need a copy as well. <br /> Thank you. <br /> Alexia Inigues, Project Planner <br /> Barghausen Consulting Engineers, Inc. <br /> 1821572 nd Ave South <br /> Kent, WA 98032 <br /> Direct) 425.656.7430 - Office) 425.251.6222 - Celli 206.255.4794 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.