Laserfiche WebLink
We are still waiting for the Form C from the contractor, so we have not submitted in CERS yet. Have you received the <br /> ELD test results yet? <br /> Thanks, <br /> Briana <br /> ------------------------- <br /> Briana L. Armstrong,Assistant Planner <br /> Barghausen Consulting Engineers, Inc. <br /> Phone: (425) 656-7466 1 Cell: (206) 799-0548 barmstrong0barghausen.com <br /> From: Briana Armstrong <br /> Sent: Friday, May 24, 2013 10:56 AM <br /> To: tttranCabsicehd.com <br /> Cc: dbock(cbcostco.com; John Ellingsen; Alexia Inigues; Chris Tebaldi; File <br /> Subject: Lubrizol additive Training Log -Tracy Costco #658 Fuel Additive install/ BCE #10050 <br /> Importance: High <br /> Thuy, <br /> Thank you for calling me yesterday about the training log for the fuel additive system. <br /> I have attached a copy of the Training Log signed by Tony Sleugh with Costco Gasoline Operations who conducted the <br /> training. An unsigned copy of the log was actually in the data but yesterday for the final inspection, but it had not been <br /> placed in the binder with the other documents. <br /> As soon as we receive the signed Certification of Installation from the contractor, we will make the final submittal in <br /> CERS. Once you receive the ELD test results and the CERS submittal, you will issue the approval to operate the tank, <br /> correct? <br /> Please let me know if you have any questions or need additional information. <br /> Thank you! <br /> Briana <br /> ------------------------- <br /> Briana L.Armstrong,Assistant Planner <br /> Barghausen Consulting Engineers, Inc. <br /> 18215 72nd Avenue South <br /> Kent,WA 98032 <br /> barmstrong@barghausen cont <br /> Phone: (425) 656-7466 <br /> Cell: (206) 799-0548 <br /> Fax: (425)251-8782 <br /> 3 <br />