Laserfiche WebLink
Comments:_ <br /> 4) QI• Unleaded 87A,Q2•Unleaded 87B and Q3•Premium PLLD Shutdowns due to L13:Dispenser <br /> Pan 1-2 Fuel alar on 5/12115.See attached work order. <br /> 15) Employees trained on 5/20/15. See attached training roster. <br /> 16) Erik Kerbel was trained on 5/20/15.See attached training roster. <br /> Items Requiring Follow-Up Actions: <br /> 10) Test contained failing components Site is awaiting rcpairs and retesting. <br /> Instructions: <br /> Monthly visual inspection of the UST system must be conducted by a Designated UST Operator,who possesses <br /> a current"California UST System Operator"certification issued by the International Code Council. <br /> A copy of this monthly visual inspection checklist must be provided to the UST Owner or Operator,but not to <br /> the State Water Resources Control Board. The UST Operator must alert the UST Owner or Operator of any <br /> condition discovered during the monthly visual inspection that may require follow-up actions. <br /> The UST Owner or Operator must maintain a copy of this monthly visual inspection checklist and all <br /> attachments for the previous 12 months.The records must be maintained on-site or, if approved by the local <br /> agency,oft`-site at a readily available location. <br /> Page 2 of 2 <br />