Laserfiche WebLink
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> Linda Turkatte, REHS <br /> r. 1868 East Hazelton Avenue <br /> PROGRAM COORDINATORS <br /> Stockton, California 95205-6232 Robert McClellon, REHS <br /> Jeff Carruesco, REHS,RDI <br /> • cq.. {P • Website: www.sjgov.org/ehd Kasey Foley,REHS <br /> t i F o R Rodney Estrada,REHS <br /> Phone: (209)468-3420 Adrienne Ellsaesser,REHS <br /> Fax: (209)464-0138 I. <br /> April 27, 2015 h_ <br /> Mark Shaw <br /> �� l y <br /> Wayne Perry INC <br /> 30 Main St STE.#5 <br /> Sacramento CA 95838 <br /> Re: Costco#658 SR0071768 <br /> 3250 W. Grant Line RD <br /> Tracy CA 95304 <br /> The San Joaquin County Environmental Health Department (EHD) has completed the review of <br /> the application for a permit to install Icon secondary test boots in UDC 5/6 and Icon split flange <br /> repair fittings on the product, vapor, and conduits in UDC 1/2 on the underground storage tank <br /> (UST) system at the above noted address. The permit has been approved with the following <br /> conditions: <br /> 1. Contact the local fire department and the San Joaquin Valley Air Pollution Control <br /> District for any applicable permits and requirements. <br /> 2. Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> 3. Contact Michelle Henry at (209) 468-3454 to arrange the following inspection <br /> appointments (a 48-hour notice is required for inspection appointments). Please be <br /> aware that inspections for emergency work must be scheduled within five days of permit <br /> approval. <br /> a. Sensor functionality: Functionality of the monitoring system must be verified to <br /> ensure that monitoring has been restored to meet the requirements of Title 23 <br /> California Code of Regulations and the Health & Safety Code. <br /> b. 24-hour hydrostatic test (or equivalent) on UDC 1/2 and 5/6 sump. <br /> c. Secondary containment testing on 87-product line in UDC 5/6 <br /> 4. Secondary containment testing for UDC 1/2, 5/6 and 87 product piping is required six <br /> months after installation. Provide 48 hours notification to the EHD when this test is <br /> scheduled. <br /> 5. Qualified service technicians must possess or work under the direct and personal <br /> supervision of an individual physically present at the work site who possesses all of the <br /> following: <br />