Laserfiche WebLink
"BREFacility Name: Costco # 658 Tracy (Page 3) CEIVED <br /> In-Tank Gauging: <br /> SEP 3 0 2016 <br /> ❑Check this box if tank gauging is used only for inventory control. <br /> Complete the following checklist: ENVIRONMENTAL HEALTH <br /> ®Yesjin <br /> g p MENT <br /> ❑ No* Has alwiring been inspected for proper entry and termination, including testing for ground <br /> fa u I ts <br /> ®Yes ❑ No* Were ing probes visually inspected for damage and residue buildup? <br /> ®Yes ❑ No* Was astem product level readings tested? <br /> ®Yes ❑ No* Was astem water level readings tested? <br /> ®Yes ❑ No* Were nstalled properly? <br /> Yes ❑ No* Were ahe equipment manufacturer's maintenance checklist completed? <br /> * in Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> ❑ Check this box if LLDs are not installed and disregard the following section. <br /> FZYes <br /> equipment P <br /> ❑ No* Fore ui ment start-u or annual equipment certification, was a leak simulated to verify LLD <br /> ❑ N/A performance? (Check all that apply) Simulated leak rate: ® 3 gph.; ❑ 0.1 gph ; ❑ 0.2 <br /> gph. <br /> ❑ No* Were allLLDs confirmed operational and accurate within regulatory requirements? <br /> ❑ No Was the testing apparatus properly calibrated? <br /> ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ❑ N/A <br /> ®Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ®Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system— <br /> El <br /> N/A is disabled or disconnected? <br /> ®Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ®Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ®Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />