My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2016 - 2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
COMPLIANCE INFO_2016 - 2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/28/2023 9:08:35 AM
Creation date
11/8/2018 10:21:53 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2016 - 2018
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\COMPLIANCE INFO 2016 - PRESENT.pdf
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
416
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7. UNDERIOSPENSER CONTAINMENT (UDC) TESTING <br /> Test Method Developed By: ❑ UDC Manufacturer ® Industry Standard ❑ Professional Engineer <br /> ❑ Other(Specify) <br /> Test Method Used: ❑Pressure ❑ Vacuum R Hydrostatic <br /> ❑ Other(Specify) <br /> Test Equipment Used: Incon TS-STS Sump Test System Equipment Resolution: +1-0.002" <br /> UDC# 1/2 UDC# 314 UDC-4 UDC# <br /> rUDCMateri <br /> ufacturer: (�l <br /> al; Plastic Plastic L4th: 30" 30" <br /> egom UDC Bottom to Top 8„ 81 <br /> FEB 0 4 2416 <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to <br /> 5" 511 NVIRONNAL. <br /> Lowest Electrical Penetration; <br /> Condition of UDC prior to Fair Fair HFp <br /> testing: <br /> Portion of UDC Tested 4"Above Pen. 4"Above Pen. <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both ❑Yes❑No ®NA El Yes ❑No RNA ❑ Yes❑No ®NA ❑Yes❑ No U NA <br /> product and water)?' <br /> Turbine shutdown response time NIA N/A <br /> is system programmed for fail- ❑ Yes❑No RNA ❑ Yes ❑No U NA ❑Yes❑No RNA ❑Yes❑No U NA <br /> safe shutdown?* <br /> Was fail-safe verified to be ❑yes❑No ®NA ❑ Yes❑No ®NA ❑Yes❑No ®NA ❑Yes❑No ®NA <br /> operational?* <br /> Wait time between applying <br /> pressure/vacuum/water and 30 minutes 30 minutes <br /> starting test <br /> Test Start Time; 10,01 AM 10:01 AM <br /> Initial Reading(Ri): 1.5049 5.3724 <br /> Test End Time: 10:16 AM 10:16 AM <br /> Final Reading(RF): 1.4472 5.3732 <br /> Test Duration: 15 min. 15 mill. <br /> Change in Reading(RF-Rs): -0.0577 0.0008 <br /> Pass/Fail Threshold or Criteria: +/-0.002 +/-0.002 <br /> Test Result: hail Pass <br /> Was sensor removed for testing? Yes Yes <br /> Was sensor properly replaced and <br /> verified functional after testing? Yes Yes <br /> Comments— (include information on repairs made prior to testing, and reconirnended follow-up for failed tests) <br /> Sensor functionality was not confirmed.This procedure is not part of the Secondary Containment Testing scope of work. <br /> If the entire depth of the UDC is not tested,specify how much was tested, If the answer to any of the questions indicated with an <br /> asterisk M is"NO"or"NA',the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.