My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2013
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GRANT LINE
>
3250
>
2300 - Underground Storage Tank Program
>
PR0518288
>
INSTALL_2013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/31/2022 3:09:55 PM
Creation date
11/8/2018 10:21:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2013
RECORD_ID
PR0518288
PE
2361
FACILITY_ID
FA0013810
FACILITY_NAME
COSTCO WHOLESALE #658
STREET_NUMBER
3250
Direction
W
STREET_NAME
GRANT LINE
STREET_TYPE
RD
City
TRACY
Zip
95377
CURRENT_STATUS
01
SITE_LOCATION
3250 W GRANT LINE RD
P_LOCATION
03
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\G\GRANT LINE\3250\PR0518288\INSTALL 2013.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
249
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Thuy Tran [EH] <br /> From: Briana Armstrong<BArmstrong@barghausen.com> <br /> Sent: Friday, May 24, 201310:56 AM <br /> To: Thuy Tran [EH] <br /> Cc: dbock@costco.com;John Ellingsen;Alexia Inigues; Chris Tebaldi; File <br /> Subject: Lubrizol additive Training Log-Tracy Costco#658 Fuel Additive install/BCE#10050 <br /> Attachments: 10050-F-Training Log-Fuel Additive-2013-05-22-Completed.pdf <br /> Importance: High <br /> Thuy, <br /> Thank you for calling me yesterday about the training log for the fuel additive system. <br /> I have attached a copy of the Training Log signed by Tony Sleugh with Costco Gasoline Operations who conducted the <br /> training.An unsigned copy of the log was actually in the data but yesterday for the final inspection, but it had not been <br /> placed in the binder with the other documents. <br /> As soon as we receive the signed Certification of Installation from the contractor,we will make the final submittal in <br /> CERS.Once you receive the ELD test results and the CERS submittal,you will issue the approval to operate the tank, <br /> correct? <br /> Please let me know if you have any questions or need additional information. <br /> Thank you! <br /> Briana <br /> ------------------------- <br /> Briana L.Armstrong,Assistant Planner <br /> Barghausen Consulting Engineers, Inc. <br /> IH2I�71nc x e e4o, <br /> kens.tvii`Pi C.,,, <br /> ba rm strong0 barghaugm.com <br /> Phone: (425) 656-7466 <br /> Cell: (206)799-054£2 <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.