Laserfiche WebLink
O 5 10 20 TRACY CA ADDITIVE "TANK ADDITION STANDARD EROSION CONTROL NOTES <br /> \ ���\\\77\� __.. _.._.... _ <br /> 1. WHEN RAINFALL AND RUNOFF OCCURS DAILY INSPECTIONS OF THE EROSION AND SEDIMENT <br /> DEMOLITION AND EROSION CONTROL PLANCONTROLS AND DISCHARGE OUTFALLS MUST BE PROVIDED BY SOME ONE KNOWLEDGEABLE <br /> 10 AND EXPERIENCED IN 'THE PRINCIPLES. PRACTICES, INSTALLATION, AND MAINTENANCE OF <br /> ray <br /> LEGENDEROSION AND SEDIMENT CONTROLS WHO WORKS FOR THE PERMITTEE. 0 Coco <br /> ��. <br /> »,,--�EX, PARKING . � _ EXCAVATION AND CREATION F AR <br /> ��,r.> �y,. r ,� O O BARE <br /> CONSTRUCTION ACTIVITIES MUST AVOID OR MINIMIZE EXCAVA _ . <br /> GROUND FROM OCTOBER 1 THROUGH MAY 31 EACH YEAR, <br /> EXISTING BARRIER CURB <br /> CONSTRUCTION FENCE TO BE DEMOLISHED <br /> EX. CONCRETE: PAD TO BE` <br /> CONSTRUCT'10 Z. DURING WET WEATHER PERIOD. 'TEMPORARY STABILIZATION OF THE SITE MUST OCCUR AT THE <br /> � SA�WCLIT <br /> �" XX��- <br /> yT, <br /> � NENG OF EACH WORK DAY.c _ EXISTING ASPHALT/CONCRETEPAVEMENT TO BE DEMOLISHED ,WITF�IN SAW CI_IMIT .DEMOLI,�HED AND REMOVED , CX. L.�; A,RE;'$ STAGING ARE. 4 1 T TR. SEDIMENT CONTROLS MUST BE INSTALLED AND MAINTAINED ON ALL DOWN GRADIENT SIDE. OF <br /> ' EX. CURB CLEARING <br /> CONSTRUCTION SITE AT ALL. TIMES DURING CONSTRUCTION, THEY MUST REMAIN IN PLACE <br /> CLEARING LIMITS UNTIL PERMANENT VEGETATION OR OTHER PERMANENT COVERING OF EXPOSED SOIL IS <br /> ESTABLISHED. <br /> GATE <br /> < CONSTRUCTION FENCE <br /> > ' E.X. TRANSFOT ti1ER,/ _ _ __ 5. _ _ _ ALL TIMES ro <br /> L ACTIVE INLETS MUST HAVE SEDIMENT CONTROLS INSTALLED AND MAINTAINED AT <br /> EX. CQNCRETE . 2 <br /> DURING CONSTRUCTION. UNLESS OTHERWISE APPROVED, A SURFACE MOUNTED AND <br /> PERIMETER PROTECTION ATTACHABLE, J-SHAPED FILTER BAG IS REQUIRED FOR ALL CURB <br /> INLET CATCH BASINS. <br /> It <br /> 1 Ex. CLI EXXD . ASPHALT EXISTING DRAINAGE FLOWPATH 6, SIGNIFICANT AMOUNTS OF SEDIMENT WHICH LEAVES THE SITE MUST BE CLEANED UP WITHIN <br /> IX 24 HOURS AND PLACED BACK ON THE SITE AND STABILIZED OR PROPERLY DISPOSED, THE c� <br /> � '- CAUSE OF THE SEDIMENT RELEASE MUST BE FOUND AND PREVENTED FROM CAUSING A <br /> ' _._... AWC lJ T �. <br /> S STORM DRAIN INLET PROTECTION °� OF <br /> V/ RECURRENCE THE DISCHARGE WITHIN THE SAME 24 HOURS. <br /> PERIMETER <br /> . �w TRIM TER 7. NOT BE INTENTIONALLY WASHED INTO STORM SEWER DRAINAGE WAY R <br /> . SEDIMENT MUST t�E � O <br /> X. -CONCRETE <br /> SHORING WATER BODIES <br /> SEWERS, � S <br /> � ' PAVEMENT `� ��" �X. LS �� ,� "" � ' a <br /> 5 <br /> ._EX. LJN�Lf1{��'OfJND � �. ���� 3 � � .��_ <br /> IRR S. SEDIMENT MUST BE REMOVED FROM BEHIND ALL SEDIMENT CONTROL MEASURES WHEN IT HAS <br /> STORA�E,.TACKS. . � � w,. <br /> VENT STACKSREACHED A HEIGHT OF 1/3RD THE BARRIER HEIGHT„ AND PRIOR TO THE CONTROL MEASURES <br /> FX.", <br /> �, ATTEND PRECONSTRUCTION MEETING WITH CITY OF TRACY. REMOVAL, cQ <br /> y <br /> � . FLAG CLEARING LIMITS, �� <br /> PAVEMENT ASPHALTr <br /> URB 1 <br /> 4 SAWCUT �" <br /> L>( ASL'I1AI T �' 9. CLEANING aM� <br /> OF ALL STRUCTURES WITH ,.SUMPS MUST OCCUR WHEN THE SEDIMENT RETENTION <br /> PAVEr�EI�T INSTALL PERIMETER PROTECTION BMPS AS SHOWN ON PLANS. CAPACITY HAS BEEN REDUCED BY 50% AND AT COMPLETION OF PROJECT, <br /> a <br /> EXISTING VEEDER ROOT <br /> TLS 35OR PANEL S 10 INCLUDE 6 <br /> a <br /> 4. INSTALL STORM DRAIN INLET PROTECTION AS SR-TOWN ON PLANS. . ANY USE OF TOXIC OR OTHER HAZARDOUS MATERIALS MUST DE PROPER STORAGE„ <br /> SEX. CONCRETE ' ." <br /> --EX. CCNTROLL-ER <br /> APPLICATION, AND DISPOSAL, <br /> . - <br /> 5. CLEAR AND GRUB SITE "' <br /> , COMPLETE DEMOLITION AND PERFORM ROUGH GRADING,. <br /> oEX. PARKINGENCLOSURE <br /> 11THE PERMITTEE MUST PROPERLY MANAGE HA ARDOUS WASTES, USED OILS, CONTAMINATED <br /> 6. CONSTRUCT SITE IMPROVEMENTS, <br /> SOILS, CONCRETE WASTE., SANITARY WASTE, LIQUID WASTE, OR OTHER TOXIC SUBSTANCES <br /> CLEARING LIMITS ONLY._.. � i�``�, � 7. REMOVE PERIMETER PROTECTION BMPS AND STORM DRAIN INLET PROTECTION, DISCOVERED OR GENERATED DURING CON STRUCTION. <br /> AS NEEDED ,FpT NEW . <br /> .0 <br /> IMPROVEMENTS . 1 THE APPLICATION RATE OF ANY FERTL TERS USED TOREESTABLISH VEGETATION MUST FOLLOW CALL FOR CITY OFTRA Y FOR FINAL INSPECTION. <br /> - _ - <br /> -CLEAN <br /> ,.. MANUFACTURER'S <br /> R'S RECOMMENDATIONS. NUTRIENT RELEASES FROM FERTILIZERS TO SURF <br /> ACE <br /> AR.S11ARACR JNT WATERS MUST BE MINIMIZED, TIME RELEASE FERTILIZERS SHOULD BE USED AND CARE LIJ <br /> . - ON CONCRETE RAD. <br /> TAKEN IN APPLICATION OF FERTILIZERS WITHIN ANY WATER WAY RIPARIAN ZONE. <br /> cq <br /> r' <br /> 13. _ w <br /> OWNER OR DESIGNATED PERSON SHALL BE RESPONSIBLE FOR PROPER INSTALLATION AND <br /> MAINTENANCE OF ALL EROSION AND SEDIMENT CONTROL MEASURES, IN ACCORDANCE WITH <br /> DEMOLITION� 1 CURRENT CLEAN WATER SERVICES STANDARDS AND STATE, AND FEDERAL REGULATIONS, LLJ ME 0) <br /> 14. PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BOUNDARIES OF THE CLEARING I...IMITS, <br /> 1 EXISTING CONCRETE CURB TO BE DEMOLISHED AND DISPOSED OF OFFSITE ONLY SHOWN ON THIS PLAN SHALL BE CLEARLY DELINEATED IN THE FIELD. UNLESS OTHERWISE <br /> SILT PROTECT 1 NECESSARY CONSTRUCTION. APPROVED, NO DISTURBANCE IS PERMITTED BEYOND THE CLEARING LIMITS, <br /> �, . RY FOR PROPOSED CONSTRUCT ON <br /> CATCH BASIN ION - � -� �" � � , _EX. (.L1RE3 ,, � , <br /> �° �-� AS NE E <br /> ASPHALT/CONCRETE,/CONCRETE PAVEMENT TO BE DEMOLISHED AND DISPOSED OF <br /> (-TYP) ., '". � EXISTING � T <br /> � ,�1 OFFSITE. 15, PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BMPS THAT MUST BE INSTALLED ARE <br /> PERIMETER SEDIMENT CONTROL, AND INLET PROTECTION, THESE BMPS MUST BE MAINTAINED <br /> DEMOLISH EXISTING LANDSCAPE AND IRRIGATION ONLY AS NECESSARY FOR FOR THE DURATION OF THE PROJECT,. <br /> PROPOSED CONSTRUCTION, CONTRACTOR TO RESTORE/MAINTAIN IRRIGATION SYSTEM <br /> ' <br /> TO NEW LANDSCAPE AREA. <br /> °T ', 16. IF VEGETATIVE SEED MIXES ARE PEf"IFIED SEEDING MUST -FAKE PLACE NO LATER THAN <br /> -` ONCRETE <br /> EX' C SAWCUT LINE, CONTRACTOR TO PROVIDE A SMOOTH, CLEAN EDGE FOR SEPTEMBER 1ST; THE TYPE AND PERCENTAGES OF SEED IN THE MIX ARE AS IDENTIFIED ON <br /> CD <br /> ....... PAVEMENT .",� � 4 <br /> �\ MATCHING INTO EXISTING PAVEMENT, THE PLANS OR AS SPECIFIED BY THE DESIGN ENGINEER. CD <br /> SHORING AS NECESSARY. CONTRACTOR SHALL SUPPLY SHORING DESIGN AND 1 c <br /> OBTAIN NECESSARY PERMITS IF REQUIRED, <br /> MUST BE USED TO TRANSPORT SATURATED ,SOILS FROM THE <br /> T S O N SITE AT A <br /> V., DESIGNATED LOCATION USING R�PPROPR ATE EQUIVALENT <br /> SOIL DRAIN <br /> BE DRAINED SUFFICIENTLY FOR <br /> MINIMAL SPILLAGE <br /> SEDIMENT Aco <br /> i <br /> F <br /> �� ALL PUMPING O LADEN WATER MUST BE DISCHARGED OVER AN UNDISTURBED, <br /> , `, FUELING EX. LS AREA � ����" � PREFERABLY VEGETATED AREA, AND THROUGL�9 A SEDIMENT CONTROL. BMP I.E. FILTER BAG). <br /> EA PY <br /> � } <br /> �r-' .. PERIMETER PROTECTION P OESSh /v <br /> 1 D. ES .SHOWN ON THE PLAN MUST BE �. q� <br /> �,-- 'i CONTRACTOR TO INSTALL. PERIMETER PROTECTION (SILT FENCE, SAND ADEN WATER DOES NOT ENTER ASURFACE � � <br /> 1 N5T EEE. PROPERLY MR O ENSURE <br /> ALL MEASURES... _ _ T OEC <br /> r . E � SEDIMENT E <br /> BAGS, FILTER BERMS} PER CITY OF TRACY STANDARDS AT ALL AR SYSTEM,P Y T R THAT DI F L <br /> �� _ WATE ROADWAY® OR OTHER PROPERTIES, �'� �� <br /> - -- - PERIMETER LOCATIONS TO PREVENT SILT-LADEN RUNOFF FROM LEAVING 3, HAL P, GRUBS. <br /> PAVEMENT - _.. ,. � <br /> TX. t,CNC,RLTE THE CONSTRUCTION AREA, AND AS DIRECTED BY THE CITY INSPECTOR. E,,.�C MEASURES SHOWN ON THIS PIAN ARE THE MINIMUM REQUIREMENTSF R <br /> 20. THE E MUM O � 1 <br /> M N <br /> EX, L.S AREA l ANTICIPATED SITE CONDITIONS, DURING THE CONSTRUCTION PERIOD. THESE MEASURES SHALL <br /> , BE UPGRADED AS NEEDED TO MAINTAIN COMPLIANCE WITH ALL REGULATIONS. <br /> , `STORM DRAIN INLET PROTECTION 6�/, Ol <br /> ; BAG PER DETAIL THIS 21. w SUGGESTED TO BE MAINTAINED ONSITE AND AVAILABLE TO DISTRICT <br /> r <br /> RA T , <br /> � CONTRACTOR TO INSTALL CATCH BASIN FILTER <br /> SHEET, AT DOWNSTREAM INLET LOCATIONS OR AS REQUIRED TO PREVENT <br /> WRITTEN ESC LOGS ARE SUG ' V .- <br /> '... -� INSPECTORS UPON REQUEST, <br /> _ SILT-LADEN WATER FROM ENTERING STORM DRAINAGE SYSTEM AND,/ORT -.O <br /> AS DIRECTED BY CITY INSPECTOR. <br /> ��- 22, IN AREAS SUBJECT TO WIND EROSION, APPROPRIATE BMPS MUST BE USED WHICH MAY <br /> ., <br /> I <br /> INCLUDE THE APPLICATIONF FINE WATER SPRAYINGS PLASTIC SHEETING® MULCHING, OR <br /> CATCH BASIN .._ �''`, N STAG A (AP ATION, CONTRACTOR TO <br /> OTHER APPROVED MEASL RE . <br /> CONSTRUCTION (NG ARE PROXIMATE LOC <br /> ,3 <br /> ;LLT PROTECTION <br /> " - ADJUST AS NECESSARY DURING CONSTRUCTION), <br /> ( <br /> � <br /> r . <br /> EX. FSO SWITCH a„a <br /> TYP �' CONTRACTOR TO UTILIZE THIS AREA FOR; 21 ALL EXPOSED SOILS MUST BE COVERED DURING WET WEATHER PERIOD, �' �0 �� <br /> ' MATERIAL DELIVERY AND STORAGE <br /> r , CONCRETE WASTE MANAGEMENT PLACE ON VISQUEEN AND COVER <br /> X S <br /> -_ Vl STOCKPILES <br /> 6 <br /> EX. Ar>f-'L-IAI_Tlij <br /> c c 10 05 <br /> PAVEMENT <br /> f � <br /> k <br /> GRATE C)ANY LG�> II ° c' <br /> J -- <br /> LIFT STRAPS <br /> / \\ c. .- <br /> br\ C ml cmf c c: <br /> ' %l e__.. <br /> GENERAL NOTES: �_ ..._.._� �--DANDY BAGS'11 c "°l <br /> NOTES:EROSION CONTROL CIO <br /> T <br /> 15 cC7 <br /> 1. ALL NECESSARY EQUIPMENT AND MATERIALS SHALL BE AVAILABLE ON SITE . <br /> 1. REMOVE EXISTING LANDSCAPING AND RE ROUTE EXISTING IRRIGATION c - STANDARD FABRIC IS c�7 <br /> TO FACILITATE RAPID INSTALLATION OR EROSION AND SEDIMENT CCONTROL �r�� � DANDY BAG II <br /> 1f � � i.r } t d 7 4_� <br /> SYSTEM AROUND CONTROLLER PAD IMPROVEMENTS AS NECESSARY TO AN ORANGE WOVEN <br /> BMP; WHEN RAIN IS EMINENT. y� - <br /> MAINTAIN IRRIGATION TO THE SITE, MONOFILAMENT INSTALLATION AND MAINTENANCEGUIDELINES: <br /> � <br /> LESS T D INSTALLATION: REMOVE THE GRATE FROM CATCH BASIN. IF USING OPTIONAL L. OIL <br /> HE OWNER CONTRACTOR SHALL RESTORE ALL EROSION CONTROL DEVICESLd �-' <br /> �' �' FIRE <br /> LNIEITHER LE,aS THANK OF NOT <br /> NOR TO WORKING ORDER TO THE SATISFACTION OF THE CITY ENGINEER, AFTER i - ----- DUMPING STI�AI- _ � -� r _r �- q <br /> ONE OR MORE PORTABLE F �' HAVING A <br /> LESS THAN 4080 SHALL BE EACH RUN-OFF PRODUCING RAINFALL. ��� ALLOWS FOR EASY r c. � <br /> MORE THAN 50 FEET FROM THE TANK STORAGE AREA, LcE:.T10VA.L. OF CONTENTS ABSORBENTS; PLACE ABSORBENT PILLOW IN UNIT. STAND THE GRATE GN ENC}. ;. <br /> MOVE THE TOP LIFTING STRAPS OUT OF THE WAY AND PLACE THE, GRATE INTO TFIE r==; <br /> I THE OWNER CONTRACTOR SHALL INSTALL ADDITIONAL. EROSION CONTROL �. � r r � r <br /> 3. CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE OWNER/CONTRACTOR � � � DANDY BAG II SO THAT EHE GRATE IS BELOW THE TOP STRAPS AND ABOVE THE <br /> SYSTEM MEASURES AS MAY BE REQUIRED BY THE CITY ENGINEERING OR BUILDING s r-” p <br /> SYSTEM MEETS THE DESIGN INTENT, THE CONTRACTOR IS PERMITTED TO �. <br /> LOWER STRAPS. HOLDING THE LIFTING DEVICES, INSERT THE GRATE INTO THE INLET. <br /> ADJUST SIZES AND CUTS BASED ON ACTUAL FIELD CONDITIONS AND INSPECTOR DUE TO UNCOMPLETED GRADING OPERATIONS OR UNFO?RESEEN - d <br /> INSTALLATION TECHNIQUES, CIRCUMSTANCES WHICH MAY ARISE. � r <br /> ., MAINTENANCE: REMOVE AL.L ACCUMULATED SEDIMENT AND DEBRIS FROM VICINITY OF i <br /> 4. ADEQUATE EROSION AND SEDIMENT CONTROL. AND PERIMETER PROTECTION <br /> UNIT AFTER EACH STORM EVENT. AFTER EACH STORM E.--,VENT AND AT REGULAR <br /> BEST MANAGEMENT PRACTICE MEASURES MUST BE INSTALLED AND INTERVALS„ LOOK INTO THE DANDY BAG(R) 11. IF THE CONTAINMENT AREA IS MORE. y` I° � <br /> MAINTAINED, THAN '1/3 FULL OF SEDIMENT, THE UNIT MIDST BE EMPTIED. TO EMPTY UNIT, LIFT ' <br /> .a- r <br /> THE UNIT OUT OF THE INLEF USING DIE LIFTING STRAPS AND REMOVE. 1HE GRATE. <br /> IF USING OPTIONAL 011_ ABSORBENTS; REPLACE ABSORBENT 'W[dE:N NEAR SATURATION. _�.. ,. T R <br /> DEMOLITION NOTES: <br /> r,,- THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALLq, <br /> 1, ITEMS FOR DEMOLITION ARE DEPICTED PER DESIGN DRAWINGS, CONTRACTOR f,. ` EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE UTILITIES AND <br /> TO LOCATE AND VERIFN ITEMS FOR DEMOLITION PRIOR TO START OF SURVEYING THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION., THIS SHALL INCLUDE Lr <br /> CONSTRUCTION, NOTIFY BARGHAL.ISEN CONSULTING ENGINEERS, INC, r CALLING UTILITY LOCATE 0 1-800-227-2600 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT MITC=) <br /> IMMEDIATELY OF ANY DISCREPANCIES OR INCOMPATABLILTIES WITH THEKnow of 0VLOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. -- <br /> DESIGN. M. <br /> F r <br /> w LOCATIONS OF SAID UTILITIES A5 SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC �. t3 <br /> ?. CONTRACTOR TO REVIEW AS—BUILT DRAWINGS IN PROJECT AREA AND beforeCATCH BASIN FILTER BAG 0 Call E INFORMATION AND ARE SUBJECT TO VARIATION, IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL c c <br /> 1 Via{ CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING err <br /> REMOVE AND/OR RELOCATE SITE APPURTENANCES IN PROJECT AREA THAT . NOT TO SCALE �� � .�,. Or Call 800.227.2600 WITH CONSTRUCTION, J <br /> IMPACTS THE PROJECT. 1> <br />