Laserfiche WebLink
z SITE CAUTION <br /> E MORADA LN r% <br /> GROUND WATER LEVEL NOTE: GENERAL NOTES J <br /> 3 ° ° POTENTIAL UTILITY ('ONFI.ICT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING AND <br /> e NEW UTILITIES PRIOR TO CONSTRUCTION. SEE UTILITY CONFLICT NOTE THE <br /> z / A SOILS REPORT OF THIS SIIL: LOCATION HAS REVEALED THAT GROUNDWATER EXISTING WATER. STORM, AND SANITARY SEWER SERVICE SHOWN IS APPROXIMATE, PIPING LEGEND G EXISTING UNDERGROUND UTILITIES y00 <br /> ° WAS NOT ENCOUNTERED BELOW THE GROUND SURFACE TO A MAXIMUM SURVEYS (WATER, GAS, TELEPHONE , SEWER) c� <br /> BASED ON FIELD SU. EY.. AND "AS-BUILT" RECORDS. THE GENERAL CONTRACTOR a w W <br /> rc�;. EXPLORED DEPTH OF 26.5 FcET. TANKS SHALL BE INSTALLED WITH SHALL 'POTHOLE" THE EXISTING UTILITIES TO VERIFY THE DIAMETER AND LOCATION - - - 2" FLEXIBLE DOUBLE WALL PRODUCT PIPING IN 4" GEODUCT F- <br /> ° - 1� CONCRETE DEADMEN AND FILTER FABRIC PER MANUFACTURERS' GUIDELINES. <br /> (INCL. ELEVATIONS) PRIOR TO CONSTRUCTION. ANY DISCREPANCIES IN THE - - - - - - - - - - - - - 3" DOUBLE WALL FIBERGLASS VENT PIPING <br /> TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS AND BE PERFORMED LOCATION OF THE EXISTING PIPE OR INCOMPATIBILITY OF THE DESIGN SHALL BE z � � `�rt W (y., <br /> QIIC � FOLLOWING THE RECOMMENDATIONS OF THE SOILS REPORT. BROUGHT TO THE IMMEDIATE ATTENTION OF THE OWNERS REPRESENTATIVE, AND - 2" OR 3" DOUBLE WALL FIBERGLASS VAPOR RECOVERY PIPING ¢ Z p r <br /> O G \ BARGHAUSEN CONSULTING ENGINEERS (425-251 -6222). INDICATES DISPENSER NUMBERING AND POSITION "' Z Q 'r J <br /> E HAMMER LN COS'11Cp `T' � °- _j N <br /> rz�1 SOILS REPORT BY: NOTE: <br /> w <br /> w UTILITY CONFLICT NOTE O <br /> t CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN O W ,� <br /> J z _ EARTH CONSULTANTS INC. INTENT AND THE CONTRACTOR IS PERMITTED TO ADJUST SIZES AND CUTS BASED ON ACTUAL FIELD o c ' ` ILL <br /> P I I 1805 - 136TH PLACE NORTHEAST, SUITE 201 CQUi1�N� CONDITIONS AND INSTALLATION TECHNIQUES. vwi w G v <br /> w m ��11 BELLEVUE, WA 98005 THE CONTRACTOR SHALL BE RESPONSIBE FOR VERIFYING THE LOCATION, * N Z W <br /> 3 a - (425) 643-3780 p PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 1/8" PER FOOT MINIMUM, 1/4' PER FOOT <br /> w <br /> - DIMENSION. AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE c w - K Q Z <br /> KYLE R. CAMPBELL P,E. 45538 o 'T PREFERRED. SIPHON VENT STACK PIPING TO SLOPE 1/4-INCH PER FOOT w Q Z J <br /> # PLANS OR NOT BY f. HOLING THE UTILITIES AND SURVEYING THE HORIZONTAL - z m w <br /> REPORT # E-9925-214, APRIL 19, 2002 AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING * SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL PRODUCT, VENT AND o w w� <br /> NOT TO SCALE NOi TO SCALE UTILITY LOCATE @ 1 (800) 227-2600 AND THEN POT HOLING ALL OF THE VAPOR RECOVERY PIPING TO BE DOUBLE CONTAINMENT PIPE. PRODUCT PIPING TO BE ROUTED IN `" w w �- <br /> EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO PHYSICALLY <br /> CONTAINMENT DUCT. <br /> TANKEXCAVATION NOTE: VERIFY WHETHER OR NOT CONFLICTS EXIST LOCATIONS OF SAID UTILITIES AS \ <br /> VICINITY MAP LOCATOR MAP SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION U <br /> oz m ~ Q <br /> TANK EXCAVATIONS SHALL BE PER OSHA REQUIREMENTS AND BE PERFORMED AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR ® W o <br /> FOLLOWING THE RECOMMENDATIONS OF THE SOILS REPORT. TANKS SHALL CONSULT BARGHAUSEN CONSULTING ENGINEERS, INC. TO RESOLVE ALL Z o <br /> EXCAVATIONS THAT REQUIRE SHORING SHALL BE ENGINEERED AND PERMITTED PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION, <br /> SEPARATELY AND SHALL BE THE RESPONSIBILITY OF THE INSTALLING TANK AND PIPING INSTALLATION NOTES O <br /> CONTRACTOR. Y Y s Y <br /> INSTALL THREE (3) 20,000 GALLON "CONTAINMENT SOLUTIONS" DOUBLE WALL FIBERGLASS TANKS WITH HYDROSTATIC ANNULAR s„ N d <br /> SPACE MONITORED BY "VEEDER ROOT" TLS-350R TANK AND PIPING MONITORING AND ALARM SYSTEM. TANKS TO BE SET MIN. " 0 <br /> 50" BELOW FINISH GRADE. SEE DWG. T-2 FOR ADDITIONAL INFORMATION. SEE SHEET T-3 FOR TANK INSTALLATIONY Y Y N W U <br /> REQUIREMENTS. TANK INSTALLATION SHALL BE IN ACCORDANCE WITH MANUFACTURER'S INSTALLATION INSTRUCTIONS. ALL TANK N cn °n' Q <br /> SUMPS TO BE EQUIPPED WITH AUTOMATIC FIRE SUPPRESSION DEVICES. o N <br /> INSTALL A 7" MIN. REINFORCED CONCRETE SLAB OVER TANKS. SURFACE WATER SHALL BE DIVERTED AWAY FROM EACH o o o Z <br /> MANHOLE BY FORMING A CONCRETE CROWN WITH A 2" DROP IN 18" I"ROM THE EDGE OF THE MANHOLE RING TO THE o <br /> SURROUNDING SLAB ELEVATION. SEE CIVIL DRAWINGS FOR INSTALLATION DETAILS, o <br /> CD INSTALL THREE (3) 4" DUAL POINT FILL ADAPTERS AND CAPS. <br /> INSTALL THREE (3) 3" DUAL POINT STAG�APOR RECOVERY ADAPTERS ANDiCAPS. <br /> CONTROLLER 3 vv-vvvvwv "vW�wv� � �Vw-�r�ivvvvvvvv` <br /> VEED ROOT ALARM 0 INSTALL ONE (1) F.E. PETRO IST 2 HP VARIABLE SPEED TURBINES IN THE PRIMARY 20,000 GALLON 87 OCTANE UNLEADED TANK, <br /> _ MONITOR SYSTEM 8 ENCLOSURE ` (TANK //1), INSTALL ONE (1) F.E. PETRO IST 2 HP VARIABLE SPEED TURBINES IN THE SECONDARY 20,000 GALLON 87 OCTANE <br /> UNLEADED TANK (TANK #2). THE TWO UNLEADED TURBINES SHALL SERVE SEPARATE HALVES OF THE STATION AS SHOWN. THE <br /> SECONDARY 20,000 GALLON 87 OCTANE UNLEADED TANK (TANK #2), SHALL BE SIPHONED TO THE PRIMARY USING TANK #1 i <br /> •✓����\ TURBINE SIPHON CHECK VALVE PORT. <br /> 1 <br /> ❑9 <br /> - 3 INSTALL ONE (1) F.E. PETRO IST 2 HP VARIABLE SPEED TURBINE IN THE 20,000 GALLON 92 OCTANE UNLEADED PREMIUM TANKD_ <br /> O (TANK #3) IN THE OFFSET POSITION, THE 92 OCTANE TURBINES SHASERVE BOTH HALVES OF THE STATION. Zj <br /> SET EACH TURBINE INTAKE AT 6" FROM BOTTOM OF TANKS. INSTALL TURBINE INTAKE FILTER SCREENS ON EACH TURBINE. <br /> IDENTIFY WITH A BRASS LABEL THE DISPENSERS SERVED BY EACH PRODUCT PIPE WHERE IT PENETRATES THE TURBINE SUMP. <br /> 2 \ CONTRACTOR TO LABEL TURBINES AND CONTROLLE! S AS TO WHICH SIDE OF THE STATION THEY SERVE. GREEN CONTROLLER <br /> ( LIGHTS ARE TO GO OUT WHEN TURBINES ARE OFF OR LOSE POWER. TURBINES TO BE EQUIPPED WITH .1 GPH PRESSURE LINE LEAK <br /> INSTALL OVERFILL ALARM > DETECTION AND PLLD DETECTORS ARE TO BE TESTED FOR THE .1 GPH LEAK DETECTION PRIOR TO START UP. CONTRACTOR TO J <br /> / AND ACKNOWLEDGE SWITCH 1� PROVIDE T T DATA AT THE TIME OF PUNCH LIST INSPECTION AND SHALL BE INCLUDED IN CLOSE OUT BINDER. <br /> � INSTALL EMERGENCY PUMP <br /> SHUTOFF SWITCH PER UEC © INSTALL 3" INSIDE 4" DOUBLE WALL FRP STAGE II VAPOR RECOVERY HEADER FOR ASSISTED VAPOR RECOVERY SYSTEM. SLOPE <br /> j <br /> REQUIREMENTS TERMINATING SUMP C E 1/8" PER FOOT MINIMUM TO TANKS. INSTALL 3" TO 2" REDUCING TEES FOR PRIMARY INSIDE DISPENSER SUMP WHERE HEADERS <br /> T-6 T-6 BRANCH TO DISPENSERS. CONTRACTOR TO INSTALL TRACER WIRE WITH VAPOR PIPING. TESTING OF VAPOR LINES SHALL BE <br /> I � <br /> PERFORMED PRIOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STAION OPERATION. SUMP PENETRATION SHALL BE ON LONG <br /> (TYP. OF 2) SIDE OF DISPENSER SUMP. <br /> ! C ( 7 INSTALL FOUR (4) 2" DOUBLE WALL GEO-FLEX GASOLINE SUPPLY PIPE INSIDE 4" GEODUCT. PIPING SHALL BE INSTALLED PER <br /> E MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. PIPING SHALL BE INSTALLED WITH A SLOPE OF 1/8" PER FOOT FROM <br /> (TYP.) T_p 6 T_2 �V\r� THE FURTHEST DISPENSER SUMP DOWN TO THE TURBINE SUMPS AND SHALL CONSIST OF CONTINUOUS RUNS BETWEEN SUMPS. <br /> - /V "�,� CONTRACTOR TO INSTALL TRACER WIRE WITH PRODUCT PIPING. TESTING OF PRODUCT LINES SHALL BE PERFORMED PRIOR TO <br /> F— — — — — — — — — — — — — BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. <br /> ',�' 2 ". -9 1 1 B" PER FT. MIN, 6 5 1 B" PER FT. MIN. 10 9 `� <br /> J� ® INSTALL VEEDER ROOT TANK AND LINE ALARM CONTROL PANEL MODEL # TLS-350R IN EQUIPMENT ENCLOSURE BUILDING, SEE W <br /> ELECTRICAL DRAWINGS FOR EXACT LOCATION. <br /> 6 W <br /> w C� 1, J Og INSTALL ONE (1) 3" INSIDE 4" DOUBLE WALL FIBERGLASS VENT LINE. SLOPE 1/4" PER FOOT MINIMUM TO LOW POINT OF O <br /> INSTALL EN! f 6 w: -� : wo VENT/VAPOR SYSTEM AS SHOWN. CONTRACTOR TO INSTALL TRACER WIRE WITH VENT PIPING. op <br /> i <br /> � � l <br /> SHUTOFF S7 ` I _ ❑° 2" INSICE 3" inl II 2" INSIDE 3" �n I=I <br /> ` -- -- TERMINATION POINT OF TANK VENT TO BE A MINIMUM OF 12' ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING /1 <br /> OR PROPERTY LINE THAT CAN BE BUILT UPON. VENT RISERS SHALL BE INSTALLED IN ACCORDANCE WITH UNIFORM FIRE CODEL! °Q <br /> S" INSIDE 4"' 3" INSIDE 4° REQUIREMENTS. INSTALL ONE (1) 1" CONDUIT W/ PULL ROPE FROM VENT RISER TO CONTROLLER ENCLOSURE FOR FUTURE TANK <br /> 3" INSIDE 4" 18 O ' 18 O DIAGNOSTIC REQUIREMENTS. I W <br /> 7 N , 7 ( 1D INSTALL THREE (3) SINGLE FLOAT ANNULAR SPACE HYDROSTATIC MONITORING SENSORS, Y <br /> 2" INSIDE 4" wi, 2" INSIDE 4" NQ Q <br /> PER FT. o_ O 1/8" PER FT. w O 12 INSTALL BALL FLOAT/VALVE EXTRACTOR ASSEMBLIEI� FOR VENT & STAo J d <br /> �( o ❑� INSTALL EMERGENCY PUMP <br /> GE II VAPOR RECOVERY. <br /> N 1/8" PER FT. MIN. ` 1/8" PER FT. MIN. SHUTOFF SWITCH PER UFC 13 INSTALL .1 GPH MAG PROBE TANK LEVEL GAUGES AT LOCATIONS SHOWN. �- Q <br /> REQUIREMENTS <br /> TANKS SHALL BE PROPERLY MARKED AND TAGGED �'NITH STANDARD API IDENTIFICATION MARKINGS AND BRASS TAGS AT FILL <br /> MANHOLES. O <br /> �4 <br /> 8O OO 12 INSTALL 2" INSIDE 3" DOUBLE WALL FIBERGLASS ACTIVE SIPHON BETWEEN 87 OCTANE TANKS AS SHOWN. SLOPE 1/4" PER U <br /> ---- ----- -- FOOT UP TO PRIMARY TANK (TANK #1). <br /> i6 INSTALL SIX (6) GILBARCO ENCORE-300 SERIES, SINGLE HOSE PER SIDE, MULTI-PRODUCT DISPENSERS AS SHOWN. DISPENSERS <br /> i> .... TO BE FITTED WITH VAPOR ASSIST STAGE II HOSES AND NOZZLES, BREAKAWAY VALVES AND UNDER DISPENSER CONTAINMENT <br /> LL INCLUDING PRODUCT AND VAPOR SHEAR VALVES, MONITORING SENSORS AND AUTOMATIC SNUFFERS. SEE SHEET T-6 FOR <br /> GILBARCO SINGLE HOSE PER TYPICAL INSTALLATION DETAILS. START UP BY COSTCO REPRESENTATIVE. GENERAL CONTRACTOR TO PURGE LINES WITH 200 <br /> w z 18 7 SIDE, 2 PRODUCT MPD GALLONS PER HOSE/NOZZLE MINIMUM. ANY AIR POCKETS OR START UP PROBLEMS DUE TO IMPROPER INSTALLATION OR <br /> a INCORRECT WIRING THAT DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. AFTER PURGING THE PRODUCT O <br /> 2" INIDE 4" <br /> 16 C D F G H LINES OF AIR AND BEFORE THE AA TESTING, CON RACTOR IS TO REPLACE THE FACTORY INSTALLED GASOLINE FILTERS WITH 0 <br /> T-6 T-6 T-6 T-6 T-6 THE COSTCO SUPPLIED FILTERS <br /> I <br /> (T-Hp. OF 4) l <br /> A 17 FILL AND STAGE I VAPOR RECOVERY RISERS & ANNULAR RISER SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE DURING <br /> FILLING OPERATIONS. SEE TANK ELECTRICAL DRAWINGS. <br /> / 2 / <br /> 3 <br /> (jD ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. <br /> '•� A 8 C J CONTRACTOR SHALL USE FLEXIBLE CONNECTORS FROM THE TANK SUMP TO THE VAPOR RECOVERY MANIFOLD. <br /> (TYP. OF 3) 11 T-4 T-4 T-4 <br /> THE OWNER'S REAL ESTATE DEPARTMENT WILL IDENTIFY THE UST AGENCY HAVING JURISDICTION, ALL INITIAL DELIVERY ��` 4 <br /> Oc _ \ REQUIREMENTS AND FORMS AND SEND TO CONSULTING ENGINEER (MULVANNYG2 PM) FOR DISTRIBUTION AND SIGNATURES. > (n <br /> 15 2" INSIDE 3" FRP CONSULTING ENGINEER (MULVANNYG2 PM) SHALL SECURE THE OWNER'S AND INSTALLER'S SIGNATURES AND DISTRIBUTE FORMS I Q l <br /> TANK qi - DACTIVE SIPHON j TO THE REAL ESTATE DEPARTMENT THE OWNER'S GASOLINE BUYING DEPARTMENT, THE GENERAL CONTRACTOR AND THE UST \/LLI � <br /> 'I (87 OCTANE) - l AGENCY HAVING JURISDICTION REQUIRED FORMS TYPICALLY INCLUDE, BUT ARE NOT LIMITED TO UST REGISTRATION, UST I -JO <br /> i <br /> 20,000 GALLON NOTIFICATION AND UST CERTIFICATION. ALL AHJ INITIAL DELIVERY REQUIREMENTS SHALL BE SATISFIED AND WRITTEN w O <br /> J K M LO'W DOCUMENTATION SENT TO THE OWNER'S GASOLINE BUYING GROUP/DEPT. PRIOR TO ORDERING GASOLINE. GASOLINE DELIVERY <br /> �PJINT -�-1 T_4 7_4 T_4 I, AND ALL TANK TESTING SHALL BE COMPLETE PRIOR TO OPENING. <br /> / OO <br /> cRossovER O ,off, TANK #2 j C COMPLIANCE NOTES Q Q { <br /> } <br /> SUPPORTS I ( 087 OCTANE) ( ) <br /> . .. (TYP ) L I 20,000 GALLON / G H 1. ARCHITECTURAL AND CIVIL DRAWINGS SHALL TAKE PRECEDENCE FOR REFERENCING ALL DIMENSIONS, PROPERTY LINES, <br /> F, T-4 T-4 % -- _ ELEVATIONS AND EQUIPMENT LOCATIONS o <br /> ILL, STAGE & II 3 4 12 _ _ < �� Y 2 _ IED N THE FIELD BEFORE STARTING ANY WORK. ANY _ <br /> . ALL DIMENSIONS AND CONDITIONS SHALL BE CHECKED AND VERIFIED R <br /> RETURN (TYP.) 14 17 18 / _ - B ` z HA <br /> DISCREPANCY SHALL BE CALLED TO THE ATTENTION OF THE OWNERS ENGINEER FOR HIS DECISION BEFORE PROCEEDING WITH ° <br /> VAPOR r T <br /> 1i CDT-2 THE WORK. <br /> I� j II O QTANK #3 I I J 3. GENERAL CONTRACTOR SHALL OBTAIN NECESSARY PERMIT FROM APPLICABLE AGENCIES FOR EXCAVATIONS OF TRENCHES 5'-0" <br /> 20,000 GALLON _ URBINE 4 AN UNAUTHORIZED RELEASE RESPONSE PLAN MU`;T BE SUBMITTED AND APPROVED BY GOVERNING AGENCY PRIOR TO TANK <br /> I (92 OCTANE) / \ OR MORE IN DEPTH INTO WHICH A PERSON IS REQUIRED TO DESCEND <br /> T <br /> , <br /> a <br /> (TYP. OF 3) 1 OPERATIONS. <br /> %'I l 13 LEVEL GAUGE (TYP. OF 3) /1 5, ALL MATERIALS SHALL BE COMPATIBLE WITH USE FOR THE INTENDED PURPOSE AS PER NATIONALLY RECOGNIZED CODES, LOCAL <br /> - I CODES AND GOVERNING AUTHORITIES. <br /> 30" MANWAY (TYP. 3 PLCS.) x <br /> (1) 3" DJA BLACK STEEL VENT 0 °� 6. THE UNDERGROUND STORAGE TANK SYSTEM SHALL BE COMPATIBLE WITH THE PRODUCT STORED. c <br /> RISER CORROSION PROTECTED TO :10 <br /> GRADE. PAINT WHITE. T_2 9 3" INSIDE 4" SLOPE 1/4' ) 7. ALL MONITORING DEVICES SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS. <br /> PER FT. TO LOW POINT <br /> 8. GENERAL CONTRACTOR IS REQUIRED TO PROVIDE 72 HOUR (TYPICAL) NOTIFICATION TO GOVERNING AGENCY PRIOR TO TANK N ' <br /> INSTALLATION, _ - <br /> .\ 9. TANK AND PIPING SYSTEM TO BE INSPECTED BY OWNER'S THIRD PARTY INSPECTOR & GOVERNING AGENCY AT FOUR (4) z <br /> SEPARATE CONSTRUCTION PHASES (SEE SPECIFICATIONS): <br /> A. TANK AIR TEST BEFORE SETTING IN HOLE AND SOAP TEST. a o <br /> B. TANKS AND PRIMARY PIPING HYDROSTATICALLY OR PNEUMATICALLY TESTED FOR 30 MINUTES. w Q <br /> C, INSPECTION OF ALL SECONDARY CONTAINMENT, INCLUDING TESTING, IN ACCORDANCE WITH <br /> � D. FINAL <br /> MANUFACTURER'S <br /> NSPECTION INCLUDING ALL PORTIONS OF THE LEAK DETECTICN SYSTEM. KE o N 00 N <br /> ID <br /> A. 1 ALL TANK SUMPS AND UNDER DISPENSER CONTAINMENT SUMPS SHALL BE HYDROSTATICALLY TESTED (LA TEST) WITH z w w o <br /> STANDING WATER TO TOP OF REDUCING COLLAR FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. N <C L0 uU z 5 <br /> RECORD THE TEST RESULTS AND SUBMIT TO OWNER. 3 N N z o <br /> 11. TANK SYSTEM, LEAK DETECTORS AND MONITORING SYSTEM INTEGRITY TESTS FORWARDED AND APPROVED BY GOVERNING � H in n > e <br /> AGENCY PRIOR TO TANK SYSTEM BEING PLACED IN OPERATION. <br /> trt o0 <br /> 12. PAYMENT OF ALL APPLICABLE UST OPERATING FEES SHALL BE SUBMITTED TO THE GOVERNING JURISDICTION o° <br /> Nh tH WITHIN 30 DAYS OF THE FINAL INSPECTION. <br /> Y <br /> rg'= Opp113. EVIDENCE OF FINANCIAL RESPONSIBILITY SHALL BE SUBMITTED TO GOVERNING AGENCY (BY COSTCO). 0 " DN2 <br /> 14. TURBINE SUMPS SHALL BE EQUIPPED WITH DISCRIMINATING LIQUID LEAK SENSORS AND WIRED FOR TURBINE SHUTDOWN. FILL/VR ` d� <br /> SUMPS SHALL BE EQUIPPED WITH LIQUID LEAK DISCRIMINATING SENSORS AND WIRED FOR AUDIBLE ALARM. Z) Alt <br /> Q O <br /> 15. MEASUREMENTS OF BRINE LEVELS SHALL BE TAKEN BY COSTCO REPRESENTATIVE DURING THREE SEPARATE VISITS TO SITE AND "V z <br /> ][,���i(��*j�y'1}K�'1 //��� PRIOR TO FUELING OPERATIONS. REFER TO TANK MANUFACTURER'S 1hSTALLATION INSTRUCTIONS FOR., REQUIREMENTS. ' <br /> V 'M ,j / v ` �. I1�/-�/V�l�/-V �/\/VVVU-`i �i1/�/���/ '�r� �✓ `- " �� i�/ u <br /> 116. TANK TEST METHOD: BEFORE THE UNDERGROUND STORAGE TANK IS PLACED INTO USE, THE UNDERGROUND STORAGE TANK 1 E�a <br /> T SHALL BE TESTED AFTER INSTALLATION USING ONE OF THE FOLLOWING METHODS TO DEMONSTRATE THAT THE TANK IS <br /> � PRODUCT TIGHT: <br /> CO�c <br /> `� 1) ENHANCED LEAK DETECTION ELD TEST (TRACER TIGHT) BY PRAXAIR OR LICENSED AFFILIATE. ,- <br /> NINERT GAS PRESSURE TEST THAT SBEEN CERTIFIED BY A THIRD PARTY APPROVED <br /> BY <br /> SCALE: 1= 10' Cell Toil Free 3) ATEST METHOD DEEMEDEQUIVA ENT TOENHAN ED LEAK DETECTION OR ANINERT GASPRESS PRESSURE BYTHEBOARDLIN <br /> UNDERGROUND TANK AND PIPING SITE PLAN D _ _ 10 20 ($��) Zw�/-2600 REGULATIONS ADOPTED PURSUANT TO THE APPLICABLE CHAPTER IN THE CODE AN UNDERGROUND STORAGE TANK INSTALLED <br /> h� AND TESTED IN ACCORDANCE WITH THIS SECTION IS EXEMPT FROM THE REQUIREMENTS. OF SECTION 25292.5. <br /> WORKING DAYS \. �/ _/��. /�/��!��\J�_/'`/�.�'�y�-/�./�- j <br /> BEFORE YOU 17. MEASUREMENTS OF BRINE LEVELS SHALL BE TAKEN BY COSTCO REPRESENTATIVE DURING THREE SEPARATE 0 <br /> DIG VISITS TO SITE AND PRIOR TO FUELING OPERATICNS. REFER TO TANK MANUFACTURER'S INSTALLATION z 0) T o <br /> INSTRUCTIONS FOR REQUIREMENTS. O N <br /> o P C <br />