My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:06:52 PM
Creation date
11/8/2018 10:22:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\2004 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />pipe is 1/5 to 1/8 <br />that of thermoplastic <br />flexible pipe and only <br />twice that of steel. <br />• Proven Joining System - <br />Lightweight RED THREAD IIA pipe <br />is joined with the proven T.A.B.T" <br />REFER TO BULLETIN 62150 for <br />dimensions of available UL/ULC <br />Listed RED THREAD IIA primary <br />and containment fittings. <br />(Threaded and <br />Bonded) joint which <br />promotes fast, positive IV <br />make-up and prevents "backout" <br />problems during cure time. These <br />features assist the installer and <br />assure economical installation. <br />• Reliability - Smith Fiberglass <br />Products fiberglass piping is <br />designed and manufactured to <br />meet the requirements of <br />governmental environmental <br />regulations, including EPA. <br />Fiberglass piping differs from other <br />products which are designed for <br />easy replacement in the event of <br />failure. <br />Easy, Economical Installation <br />The exclusive T.A.B. joint is <br />available on primary piping. Spigot <br />ends and couplings are threaded <br />with special profile double -lead <br />threads. The standard joining <br />procedure for field -made epoxy <br />bonds is achieved <br />by the mechanical <br />locking action of <br />matching bell and <br />spigot tapered angles - <br />Compatible adhesives <br />from Smith Fiberglass <br />Products are used to bond <br />the piping system. The <br />components needed to make a <br />bond, along with a detailed <br />instruction sheet, are included <br />with each adhesive kit. <br />When RED THREAD IIA primary <br />pipe is cut to length on the jobsite, <br />the cut end must be retapered. <br />Tapering tools, available from <br />Smith Fiberglass Products (Bulletin <br />No. F6600 and F6625), quickly <br />apply the proper matching taper— <br />similar to a pencil sharpener. Plain, <br />unthreaded field -made tapers can <br />be joined with T.A.B. joint <br />couplings. Either T.A.B. spigots or <br />field -made tapers may be joined <br />with belled fittings. <br />When connecting containment <br />pipe and fittings, plain ends of the <br />containment pipe are machined or <br />thoroughly sanded to accept the <br />two-piece UL/ULC Listed <br />containment fitting. Matching <br />adhesives are used to bond the <br />system. <br />For a complete catalog or Case <br />Histories describing real-life RED <br />THREAD IIA application success <br />stories, please call 501/568-4010. <br />
The URL can be used to link to this page
Your browser does not support the video tag.