My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:06:52 PM
Creation date
11/8/2018 10:22:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\2004 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br /> CIVIL ENGINEERING,LAND PLANNING,SURVEYING,ENVIRONMENTAL SERVICES <br /> i ? January 5,2004 <br /> s e``T� FEDERAL EXPRESS <br /> ~G ENG�N��� <br /> Michele Sterni Le <br /> San Joaquin County <br /> Public Health Services <br /> Environmental Health Division <br /> 304 Hast Weber Avenue, 3rd Floor <br /> Stockton, CA 95202-2708 <br /> RE: Underground Storage Tank Plan Addendum <br /> Costco Wholesale Stockton Fueling Facility <br /> 1616 East Hammer Lane, Stockton, California <br /> Costco Loc. No. 38/Our Job No. 10199 <br /> Dear Michele: <br /> On behalf of Costco Wholesale (Costco), Barghausen Consulting Engineers Inc., respectfully requests <br /> that the San Joaquin County Environmental Health Division review the enclosed minor Plan Addendum <br /> for the project referenced above. Specific plan changes include the following: <br /> • Environ coaxial fittings in place of Environ swedge fittings <br /> • Environ double entry boots in place of standard entry boots <br /> • Additional installation detail has been provided for the Phil-Tite spill box <br /> • PTi sealant in place of Burke-U-Seal <br /> • Cross connection between 87 octane tanks has been removed <br /> • Additional cables for future Veeder Root In Station Diagnostic (ISD) system. Intrinsically Safe <br /> Belden cable installed in the dispenser sump conduit. <br /> • Stage II vapor recovery has been revised to Healy <br /> • PTi sealant specified in place of'Burke-U-Seal" <br /> • Other minor plan changes as noted by revision clouds <br /> At this time we are providing the following plans and documents for review and processing: <br /> 1. One (1) set of electrical and underground tank plans, wet stamped and signed, prepared by <br /> Barghausen Consulting Engineers,Inc., dated January 6, 2004 <br /> 2. One(1)copy of cut sheets <br /> 18215 72ND AVENUE SOUTH KENT,WA 98032 (425)251-6222 (425)251-8782 FAX <br /> BRANCH OFFICES ♦ OLYMPIA,WA ♦ TEMECULA,CA ♦ WALNUT CREEK,CA <br /> www.barghausen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.