My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:06:52 PM
Creation date
11/8/2018 10:22:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\2004 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> GHA V <br /> S CIVIL ENGINEERING,LAND PLANNING,SURVEYING,ENVIRONMENTAL SERVICES <br /> �Ir I��� �Z <br /> E. <br /> 0 U <br /> 2 <br /> �S@T'NG�NG r Ery December 31, 2002 n (� WED�D <br /> Facsimile: (209)468-3433 w � <br /> JAN 0 2 2003 <br /> Ray VonFlue ENVIROIyIME`J1 HEALTH <br /> San Joaquin County PERMITI NERVUS <br /> Environmental Health Department <br /> 304 East Weber Avenue,Third Floor <br /> Stockton, CA 95202-2708 <br /> RE: Request for Extension of Underground Storage Tank Permit <br /> Costco Wholesale Retail Fueling Facility Project <br /> 1616 East Hammer Lane, Stockton, CA <br /> Costco Loc. No. 38/Our Job No. 10199 <br /> Dear Mr.VonFlue: <br /> On behalf of our client, Costco Wholesale Corporation, Barghausen Consulting Engineers, Inc., is <br /> requesting an extension to the approved Underground Storage Tank Permit for the fueling facility at the <br /> location referenced above. The permit was approved on September 25, 2002. The Conditions of <br /> Approval state that the permit expires at the end of the calendar year [2002], which allows for a <br /> three-month period for installation. We would like to request an extension of this permit until December <br /> 31, 2003,to allow additional time to install the approved tank system. <br /> Please extend the expiration date of the Underground Storage Tank Permit and issue a revised approval <br /> letter, with conditions, at your earliest convenience. If you should have any questions or concerns, or if <br /> you need additional information,please contact me immediately at(425)251-6222. <br /> R spectfully, <br /> ., <br /> Harley Ma tso i <br /> Project Planner <br /> HMM/dm <br /> 10199c.034.doc <br /> cc: Ms. Kim Stever, Costco Wholesale <br /> Mr. Tatsumi Masuda,MulvannyG2 Architecture <br /> Mr. Jay S. Grubb,Barghausen Consulting Engineers, Inc. <br /> Mr.John Ellingsen,Barghausen Consulting Engineers, Inc. <br /> 18215 72ND AVENUE SOUTH KENT,WA 98032 {425)251-6222 (425)251-8782 FAX <br /> www.barghausen.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.