My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:06:52 PM
Creation date
11/8/2018 10:22:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\2004 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UST SYSTEM DRAWING INFORMATION • 6 <br /> 1. _ r Three complete sets of plans(include manufacturer's specification sheets for proposed equipment to be <br /> installed). <br /> 2. g Plans drawn to scale in non-erasable print. <br /> 3. _g Plot plan to show location of tanks and all associated piping. <br /> 4. _%_ Striker plates or drop tube-mounted bottom protectors illustrated below all accessible openings. <br /> 5. _�_ Tank cross-sectional diagram. <br /> 6. _�_ Detail of tank,associated piping,excavation and cover. <br /> 7, _�_ Tank(s)and piping approved by a nationally recognized independent testing organization. [Title 23,Chapter 16, <br /> Article 3,Section 2631 (b)&2635] <br /> 8. _ X Verification of product compatibility with the tank(s), piping,monitoring <br /> device(s),epoxy or silicone glues,etc. <br /> 9. _g Manufacturer's written installation instructions for tank(s),piping,monitoring devices,etc. <br /> 10. _g At the installation site, prior to installation,a tightness test shall be performed on both primary(10)and secondary <br /> (20)containment systems before covering. [Section 2635(a)(3)&(4)] <br /> 11. _ R_ Tank integrity test required upon completion of installation with tank in operating condition. Test results to be <br /> submitted directly to EHD from the testing company or owner of facility. [Health&Safety Code,Division 20, <br /> Chapter 6.7,Section 25291 (h)] <br /> 12. TANK COMPOSITION <br /> TANK# x 1 2 d 3 d <br /> rAPACITY 20 000 20 ODO 20000 <br /> �,o�tjlnment �,o�tlnmen �,otlnmen <br /> i. <br /> PC) u ions o u ions o u ions <br /> FRP FRP FRP <br /> 87 Octane 87 Octane 92 Octane <br /> CORROSION Yes Yes Yes <br /> III II.RTpn Yes Yes e <br /> COMPATIBILITY <br /> WITH t00% Yes Yes Yes <br /> 13. TANK(s)TO BE INSTALLED <br /> N_/_A A. Steel-clad with fiberglass reinforced plastic coatings,composites,or equivalent non-metallic exterior <br /> coatings or coverings. <br /> (1) Tested at the installation site using an electric resistance holiday detector. <br /> (2) Vacuum applied to interstitial space. <br /> B__ B. Fiberglass <br /> _%_ (1) Installation instructions require an air test and soap bubble test prior to installation. <br /> (2) Vacuum applied to interstitial space. <br /> (3) Hydrostatic annular(primary tank pressure test). <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.