My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2004
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
1630
>
2300 - Underground Storage Tank Program
>
PR0518624
>
INSTALL_2004
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2021 1:06:52 PM
Creation date
11/8/2018 10:22:00 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2004
RECORD_ID
PR0518624
PE
2371
FACILITY_ID
FA0024496
FACILITY_NAME
Costco Wholesale #38 (Gas Station)
STREET_NUMBER
1630
Direction
E
STREET_NAME
HAMMER
STREET_TYPE
Ln
City
Stockton
Zip
95210
APN
09428011
CURRENT_STATUS
01
SITE_LOCATION
1630 E Hammer Ln
QC Status
Approved
Supplemental fields
FilePath
\MIGRATIONS3\H\HAMMER\1630\PR0518624\2004 INSTALL.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ohe product overfilling[Section 2635(b)(2)(D)0 <br /> Manufacturer:___OPW Model:__53VK,-0j20 . <br /> 18. PIPING INFORMATION <br /> DISTANCE <br /> njAPF:N.'FRt TANK 160' 137' 300' (co fined) <br /> MANUFACTORER Environ Euviron Euviron <br /> SYSTEM TYPE* Pressure Pressure Pressure <br /> ** ouble Wal]Double Wall Double Wal <br /> MATFPIAI *** HDPE HDPE HDPE <br /> LEAK DETECTION Veeder Veeder Veeder <br /> SYSTEM Root Root Root <br /> 100%COMPATIBILITY Yes Yes Yes <br /> WITH METHANOLCORROSION <br /> PROTECTIONYes Yes Yes <br /> * System Type; suction,pressure,and gravity <br /> ** Construction: single-walled,double-walled,lined-trench,etc. <br /> *** Material Type; steel with cathodic protection,stainless-steel,fiberglass reinforced plastic. <br /> 19. _g._ Piping(cross-sectional diagram,including connections to tank and dispensers). <br /> (A) Vent and tank riser primary containment system equipped with overfill prevention system that: <br /> _HtA Restricts delivery of flow to tank[Section 2635(b)(2)(B)or(C)],or <br /> _% Provide positive shut off of flow to the tank at no more than 95%[Section 2635(b)(2)(C)],or <br /> (B) _g Vapor recovery piping designed so it cannot contain liquid phase product,or <br /> (C) _jjtA Suction piping(below grade piping operates at less than atmospheric pressure)[Section 2636(a)(3)] <br /> _JIA Sloped so contents of the pipe will drain back into the storage tank if the suction is released. <br /> N(A No valves or pumps installed below grade. <br /> RIA Inspection method provided to demonstrate compliance with section 2636(a)(3). <br /> (D) NLA Corrodible underground piping protected against corrosion(Section 2636(b)). <br /> (E) Underground primary piping will meet all of the following requirements <br /> g_ Primary piping in contact with hazardous substance under normal operation conditions shall be: <br /> installed inside a secondary containment system in the form of:—secondary pipe___Vault or <br /> ____lined trench to be sloped to a collection sump at the low point of the piping. <br /> _g _ Primary piping and secondary containment systems will be installed in accordance with industry <br /> code of practice and voluntary consensus standards.. <br /> 91A Lined trench used as secondary containment <br /> NJA Material compatible with the substance stored. <br /> NLA Covered and capable of supporting any expected vehicular traffic. <br /> (F) Underground piping with secondary containment will be equipped and monitored as follows: <br /> Secondary containment will be equipped with a continuous monitoring system connected to an <br /> audible and visual alarm system. <br /> 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.